2 of 6 <br />Special Conditions, Permits, and Inspection Fees: <br />Follow any published specifications governing local building procedures for applicable building permit <br />fees, health department fees, all inspection fees, site concrete testing fees, and compaction tests, if <br />required by Owner. PRC is responsible for all required State inspections and final State insignia <br />certification of the building, if applicable. <br />Jurisdiction for Off-site Work: <br />Jurisdiction, for permitting and inspection of this building shall be either the State agency who manages <br />prefabricated building compliance in the state or the local CBO (when the State does not provide <br />certification.) If the responsibility for building inspection is the local CBO, we will provide a certified plan <br />set, calculations, and a third-party engineer inspection report for any and all closed work the local <br />official cannot see. <br />PUBLIC RESTROOM COMPANY SCOPE OF WORK: <br />Our In Plant/Off-Site Construction Scheduling System: <br />PRC has several off-site manufacturing centers in the United States, strategically located, with the <br />proper equipment and trained staff to fabricate our custom buildings to our high-quality fit and finish <br />standards. PRC manages quality control in our off-site production facility to comply with the approved <br />drawings and provides an inspection certification and photos as required. When proprietary materials, <br />which we have designed and fabricated, are part of the project, PRC supplies the manufacturing centers <br />with these proprietary PRC components. We then schedule the in-plant construction process to <br />coordinate with your delivery date through our Operations Division field staff. We guaranty on time at <br />cost delivery weather permitting. <br />Special Payment and Progress Billing Terms: <br />Invoicing begins on the 30th of the month following an order and/or the acceptance of the proposal/contract. <br />The first progress billing invoice will be issued for the commencement of design and engineering of <br />architectural plans. This will be 10% of the contracted amount. Once construction begins invoicing will <br />commence monthly based on plant percentage of completion, supported by photographs. <br />In the event of project stoppage, additional fees may be assessed for re-mobilization, storage, crane <br />costs, etc. Our discounted project costs are based upon timely payments. Delays in payment could <br />change delivery schedules and project costs. <br />Time of Completion: <br />PRC estimates a 240 calendar day schedule to complete our scope of work from receipt of written notice <br />to proceed together with signed approved architectural submittals; including final construction <br />documents and structural calculations from all authorities required to approve them. <br />EMB Public Restroom - City of Everett, WA| 6/20/2023| Reference # 11543A-4/2/2023-4 <br />2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448