My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Restroom Comnpany 6/28/2023
>
Contracts
>
Agreement
>
Sales Agreements (not Real Property)
>
Public Restroom Comnpany 6/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 9:45:10 AM
Creation date
6/28/2023 9:44:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Public Restroom Comnpany
Approval Date
6/28/2023
Council Approval Date
5/10/2023
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
EMB Public Restroom
Tracking Number
0003795
Total Compensation
$383,993.89
Contract Type
Agreement
Contract Subtype
Sales Agreements (not Real Property)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMB Public Restroom - City of Everett, WA| 6/20/2023| Reference # 11543A-4/2/2023-4 <br />2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 <br />3 of 6 <br />Exclusions/Exceptions: <br />1.Access issues for delivery of the building by a clear unobstructed path of travel from an <br />improved roadway to the final installation pad or foundation may cause site delays and <br />extra cost at each site. This exclusion covers sites whose access is limited by trees, <br />inaccessible roadways, overhead power lines at location where crane will lift building, <br />grade changes disallowing our delivery trailers with only 4” of clearance to grade, berms, <br />or uneven site grades, or when the path of travel is over improvements such as sidewalks, <br />all of which are not within the scope of work by PRC. On some sites without on-site <br />storage availability for buildings that cannot be set, relocation to a proximal crane yard <br />and later relocated to the site for installation, will incur additional fees at rates that vary <br />depending on local rates. PRC will provide written costs for this additional work by change <br />order. <br />2.If weather on site causes site delivery issues, the delivery may have to be diverted to an <br />off-site location and the additional costs will be a change order to the bid. Our staff works <br />with the Owner/General Contractor in advance to make sure sound decisions for delivery <br />are made to avoid this issue. But sometimes Owner/General Contractor take risks for <br />weather, but this risk is clearly at the Owner/General Contractor risk, not PRC. <br />3.Sidewalks outside the building footprint. <br />4.Trench plates or matting needed for protection of site soils, sidewalks, hardscaping, or site <br />utilities shall be the responsibility of the Owner/General Contractor. Any site soils damage <br />or other site improvements if damaged during installation shall be the responsibility of <br />the Owner/General Contractor. <br />5.Not responsible for removing any soil, sand, or other debris as a result of trenching or <br />installation. <br />6.Survey, location of building corners, finish floor elevation, excavation, and construction of <br />subgrade building pad and footings (if required) per PRC plans. <br />7.Soil conditions not suitable for bearing a minimum of 1500 PSF with compaction to 90% <br />maximum dry density shall require Owner/General Contractor correction before building <br />placement. If no soils testing report is available before bid, Owner/General Contractor <br />must verify site supporting soils at a minimum of 1500 PSF because that is the least we <br />can place our structures on or Owner/General Contractor or engineer of record must <br />design a foundation system to meet the imposed loads of site placement. <br />8.Improper water pressure, an undersized meter, or improper water volume flow to the <br />building may necessitate a change order for installation of a building internal diaphragm <br />tank to provide the minimum flow rate and static pressure of up to 60 PSI and a minimum <br />of 40 PSI to properly flush the fixtures. Building water service chlorination, post <br />installation, shall be by Owner/General Contractor. <br />9.Our bid included crane costs are based on a maximum 35’ radius from the center pin of <br />the crane (10’ back from the rear of the crane) to the building center point of the furthest <br />building module roof. If additional distance requires a larger crane, additional costs will be <br />assessed by change order to the Owner/General Contractor. <br />10.Bonds, building permits, a site survey, special inspection fees, minor trash removal <br />(nominally one pickup truck of shipping materials), final utility connections to the on-site
The URL can be used to link to this page
Your browser does not support the video tag.