My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6722 HIGHLAND DR 2023-08-01
>
Address Records
>
HIGHLAND DR
>
6722
>
6722 HIGHLAND DR 2023-08-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 2:06:05 PM
Creation date
7/17/2023 11:27:26 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND DR
Street Number
6722
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />10. The drawings should include a fastener schedule per IRC Table R602.3(1). A reference to this table does not <br />satisfy this requirement. <br />11. The new header supports framing from a hip roof. Verify that the (2)2x6 header is sufficient for the design loads <br />per IRC Table R301.5 and Section R602.7. King and jamb studs should be specified per Section R602.7.5. <br />12. Landing should be specified outside each exterior door. <br />13. Details for the ramp construction, including the guards and handrails, should be included in the construction <br />drawings. The guards and handrails should be capable of supporting a minimum 200-pound load. <br />14. Details for bathroom grab bars should be included. The details should include blocking capable of supporting a <br />minimum 250-pound load. <br />15. A new AFH checklist needs to be submitted. The previous form was completed by the previous designer. The <br />new form needs to include an updated floor plan per Section 3. <br />16. This comment may not require action. The new habitable space does not appear to exceed 500 SF. However, if <br />the design is revised to convert the storage area to habitable space and exceed 500 SF, a new whole house <br />ventilation system will be required. <br />In addition, please contact the Planning department for the following comment. Grace Pollard performed the Planning <br />review. <br />17. The site plan prepared by the previous designer was approved by Planning. Verify if Planning requires a new site <br />plan to be submitted for review. <br />Please let me know if you have questions. <br />— Drew Martin, P.E., S.E. <br />Associate Engineer —Commercial Plans Examiner I Permit Services <br />425.257.8810 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br />EVERETT Phone Hours: M/W/T: 8 am -12 pm & 1 pm — 3 pm; Tu: 1:00pm-3:00pm <br />everettwa.gov/permits I Facebook I Twitter <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br />Records Act. <br />
The URL can be used to link to this page
Your browser does not support the video tag.