My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SHIELS OBLETZ JOHNSEN, INC. 7/18/2023
>
Contracts
>
6 Years Then Destroy
>
2023
>
SHIELS OBLETZ JOHNSEN, INC. 7/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2023 3:21:05 PM
Creation date
7/18/2023 3:20:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
SHIELS OBLETZ JOHNSEN, INC.
Approval Date
7/18/2023
End Date
12/31/2023
Department
Procurement
Department Project Manager
Theresa Baccio-Teschlog
Subject / Project Title
proposed development and construction of a multi-purpose park, amphitheater, and minor league stadiu
Tracking Number
0003828
Total Compensation
$50,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A (Scope of Work) - 4 <br />8. Concept Design – develop draft conceptual project design for each site alternative to depict <br />facility orientation, adjacent development potential, basic facility materiality, operational <br />perspectives, neighborhood connectivity, connectivity to parking facilities and public <br />transportation, and other factors which will be determined in order to depict the project. <br />9. Other – The City and Project Manager may add/modify the scope and tasks included in Task <br />II. <br /> <br />Task III – Site Feasibility and Economic Impact <br />1. Parking – provide an initial assessment of parking needs, potential parking inventory <br />development within the site alternatives, and parking assets within a 20-minute walking <br />distance to the site, identifying specific parking types (private, public, garage, surface, etc.), <br />owners, total capacities, other uses that could impact facility event availability (net <br />available) and pricing. <br />2. Traffic – provide an initial opinion of ingress/egress circumstances, challenges, and likely <br />modifications that could/should be considered for facility operations. <br />3. Acquisition – provide an initial assessment of land assembly feasibility, including the number <br />of parcels required, owner, historical title transfer/price information, and a rough estimate <br />of land acquisition costs. This task must be done in close cooperation with the City site <br />acquisition legal counsel. <br />4. Commercial Development – provide an initial opinion of commercial development <br />opportunities within the sites and/or adjacent to the sites. <br />5. Neighborhood Assessment – provide a description of any adjacent, abutting, or otherwise <br />impacted neighborhoods, communities, districts, or enterprises with an opinion of benefits <br />and/or challenges to the project. <br />6. Economic Impact – extension of the project’s economic impacts which should be site <br />specific, such as adjacent, ancillary commercial development opportunities and catalytic <br />influence for community redevelopment. <br />7. Other – The City and Project Manager may add/modify scope and tasks included in Task III. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.