Laserfiche WebLink
1GGeminus Boeing Project Contract No.EVE-16-2929 <br /> Technology Development CEI Project No. 160731 <br /> Mean of PercentOfLEL <br /> -X 0.000 5 0.50 0.75 1.00 1.25 1.50 1.75 2.0 <br /> Figure 80: % of LEL contour cross section cut #5 (see Figure 59) for Case 3/Scenario <br /> lb. Length scale denoted in units of feet. <br /> [lIlT . <br /> 5 10• <br /> Mean of PercentOfLEL <br /> 2 X 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.750100 <br /> Figure 81: % of LEL contour cross section cut #6 (see Figure 59) for Case 3/Scenario <br /> lb. Length scale denoted in units of feet. <br /> 78 <br />