My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD PAINT HANGAR BOUNDARIES 2023-07-20
>
Address Records
>
W CASINO RD
>
3003
>
PAINT HANGAR BOUNDARIES
>
3003 W CASINO RD PAINT HANGAR BOUNDARIES 2023-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2023 10:21:20 AM
Creation date
7/20/2023 10:15:10 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
PAINT HANGAR BOUNDARIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ILICGeminus Boeing Project Contract No.EVE-16-2929 <br /> Technology Development CEI Project No. 160731 <br /> 0 0 0 0 <br /> 0 0 0 <br /> .0 0 0 <br /> 0. 00. 0 e o <br /> Mean of PercentOfLEL Mean of PercentOfLEL <br /> 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 <br /> Figure 82: % of LEL contour cross section cut #7 & #8 (see Figure 59) for Case <br /> 3/Scenario 1 b. <br /> • <br /> • <br /> Mean of PercentOfLEL Mean of PercentOfLEL <br /> 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 <br /> 1111 EMI <br /> Figure 83: % of LEL contour cross section cut #9 & #10 (see Figure 59) for Case <br /> 3/Scenario lb. <br /> 4.5 Case 3/Scenario 2b-75% Ventilation Mode, Wing & Horizontal Stabilizer Paint <br /> Configuration 2 <br /> Case 3/Scenario 2b models the hangar airflow and volatile concentration while the ventilation <br /> system is at 75% normal mode, and painting is taking place at the forward, mid, and aft sections <br /> of the fuselage, at the top of the wing at mid-span, and at the top of the horizontal stabilizer at <br /> mid-span/mid-chord. The HSP was raised up to -2' below the horizontal stabilizer. The high <br /> bay stacker was moved to allow the painter to exit onto the HSP as illustrated in Figure 84. The <br /> 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.