Laserfiche WebLink
J-.C. Geminus Boeing Project Contract No.EVE-16-2929 <br /> Technology Development CEI Project No. 160731 <br /> I I <br /> I — <br /> I II <br /> I I I I tCP1-1 <br /> I I I --- <br /> 1.11 =lid <br /> --I I - I --- <br /> I I I I I -- <br /> I II <br /> - <br /> I I <br /> Mean of PercentOfLEL <br /> 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 0 <br /> Figure 104: Computed % of LEL levels at the entrances to the floor exhausts for Case <br /> 3/Scenario 3b. <br /> NIL IL <br /> { I{ ;• <br /> • <br /> Y Mean of PercentOfLEL <br /> Z_.X 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 10 <br /> Figure 105: Computed % of LEL contour levels on the hangar/aircraft centerline for Case <br /> 3/Scenario 3b. <br /> 95 <br />