Laserfiche WebLink
Geminus Boeing Project Contract No.EVE-16-2929 <br /> Technology Development CEI Project No. 160731 <br /> a s• io• <br /> 'Y Mean of PercentOfLEL <br /> 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75040 <br /> Figure 106: % of LEL contour cross section cut #1 (see Figure 59) for Case 3/Scenario <br /> 3b. Length scale denoted in units of feet. <br /> J <br /> .Y Mean of PercentOfLEL <br /> .1 X 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.756.00 <br /> Figure 107: % of LEL contour cross section cut #2 (see Figure 59) for Case 3/Scenario <br /> 3b. Length scale denoted in units of feet. <br /> 96 <br /> 1 <br />