My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4320 THOMSON AVE 2023-08-10
>
Address Records
>
THOMSON AVE
>
4320
>
4320 THOMSON AVE 2023-08-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 2:09:30 PM
Creation date
7/27/2023 3:56:26 PM
Metadata
Fields
Template:
Address Document
Street Name
THOMSON AVE
Street Number
4320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thomson Residence March 5, 2021 <br />Stormwater Site Plan Report Section III, Page 1 <br />Section III — Off -Site Analysis <br />Section III Summary <br />Task 1— Define and map the study area <br />Task 2 — Review all available information on the study area <br />Task 3 — Field inspect the study area <br />Task 4 — Describe the drainage system, and its existing and predicted problems <br />Task 1— Define and map the study area <br />An initial qualitative analysis shall document potential off -site impacts of stormwater discharges for each <br />upstream drainage system entering a site, and each downstream drainage system leaving a site according <br />to Section 1-2.6.2 of the 2014 SWMMWW. The downstream analysis shall extend from the project site to <br />the receiving water, or up to one -quarter mile, whichever is less. In this case, runoff from the project site <br />will be conveyed downstream in a combined sewer main from Thomson Ave to Crescent Ave, so one - <br />quarter mile will be the extend of the downstream analysis. <br />Task 2 — Review all available information on the study area <br />Runoff from the project will be conveyed to a detention tank with a flow control structure and an overflow <br />into the existing sewer main on Thomson Ave. From here, the combined sewer flows north on Thomson <br />Ave and then east on Crescent Ave through conveyance pipes and manholes. It reaches the quarter -mile <br />mark at the intersection of Grand Ave and 42"d St NE. Figure II-1 below was gathered from the Everett City <br />GIS Map and shows the project site and the quarter -mile mark. <br />C 250 4th Avenue South, Suite 200 <br />Edmonds, WA 98020 <br />ENGINEERING ph.425.778.8500 1 f.425,778.5536 <br />www.cgengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.