My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3710 TULALIP AVE 2023-08-24
>
Address Records
>
TULALIP AVE
>
3710
>
3710 TULALIP AVE 2023-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 8:46:10 AM
Creation date
7/28/2023 10:45:18 AM
Metadata
Fields
Template:
Address Document
Street Name
TULALIP AVE
Street Number
3710
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />11/1/2022 <br />11/1/2022 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />RESCHEDULE <br />eTRAKiT Inspection Request <br />ONLINE <br />Notes: <br />10/31/2022 1:46 PM Lyle Kelly <br />Contact Name: Lyle Kelly <br />Site Address: 3710 TULALIP AVE <br />Phone:2062653749 <br />e-Mail: Ikelly@walshgroup.com <br />Called Lyle. No building inspector available. Reschedule online. <br />11/15/2022 <br />11/15/2022 <br />BLDG 08-FRAMING <br />KURT KECK <br />APPROVAL <br />eTRAKiT Inspection Request <br />Notes: <br />11/14/2022 10:17 AM Lyle Kelly <br />Contact Name: Lyle Kelly <br />Site Address: 3710 TULALIP AVE <br />Phone:2062653749 <br />e-Mail: Ikelly@walshgroup.com <br />Approved as noted: Contractor to install handrail on stairway as per IBC. Will inspect at Building final. <br />Note: I -Beam installation above overhead garage door installed as per ingineered drawing. <br />3/29/2023 <br />3/29/2023 <br />BLDG 16-FINAL <br />KURT KECK <br />NOT READY <br />eTRAKiT Inspection Request <br />Notes: <br />3/27/2023 12:45 PM Lyle kelly <br />Contact Name: Lyle kelly <br />Site Address: 3710 TULALIP AVE <br />Phone:2062653749 <br />e-Mail: lyle.kelly87@gmail.com <br />1. Obtain final on electrical permit E2203-237 <br />2. Attach special inspections/ final letters to building permit per sheet SF2 and SF3 on plans. <br />3. Reschedule for building final when ready. <br />5_T_ <br />/25/2023 <br />5/26/2023 <br />BLDG 16-FINAL <br />TONY LEE <br />APPRVD PERMIT <br />eTRAKiT Inspection Request <br />FINAL <br />Notes: <br />5/24/2023 7:49 AM Lyle kelly <br />Contact Name: Lyle kelly <br />Site Address: 3710 TULALIP AVE <br />Phone:2062653749 <br />e-Mail: Iyle.kelly87@gmail.com <br />Previous corrections made. Note electrical has been approved for the building per permit E2107-139 inspection date 2/22/2023 <br />Special inspection non-conformance items were resolved by construction inspector. <br />5/29/2023 <br />5/30/2023 <br />CERTIFICATE OF <br />Permit Technician <br />NOT REQUIRED <br />OCCUPANCY <br />Notes: <br />Printed: Thursday, 01 June, 2023 3 of 3 <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.