Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />7/20/2022 <br />7/20/2022 <br />BLDG 08-FRAMING <br />KURT KECK <br />CORRECTION <br />See notes <br />REQUIRED <br />Notes: <br />7/18/2022 11:00 AM Whitney Roulstone <br />Contact Name: Whitney Roulstone <br />Site Address: 3710 TULALIP AVE <br />Phone:2062147910 <br />e-Mail: Wroulstone@walshgroup.com <br />(7/20/2022 3:14 PM KMK) <br />1. Provide special inspection reports per SF2, SF3 <br />2. Have approved set of plans on site for next inspection <br />Note: Send reports and final letter to kkeck@everettwa.gov <br />When sending emails, include building permit and address on email <br />8/18/2022 <br />8/18/2022 <br />BLDG 08-FRAMING <br />F KURT KECK <br />NOT READY <br />eTRAKiT Inspection Request <br />Notes: <br />8/17/2022 7:16 AM Whitney Roulstone <br />Contact Name: Whitney Roulstone <br />Site Address: 3710 TULALIP AVE <br />Phone:2062147910 <br />e-Mail: Wroulstone@walshgroup.com <br />(8/18/2022 1:02 PM KMK) <br />1. Complete electrical and mechanical rough in inspections. <br />2. Reschedule for framing when ready. <br />10/27/2022 <br />10/27/2022 <br />BLDG 08-FRAMING <br />KURT KECK <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />10/25/2022 9:38 AM Lyle Kelly <br />Contact Name: Lyle Kelly <br />Site Address: 3710 TULALIP AVE <br />Phone:2062653749 <br />e-Mail: Ikelly@walshgroup.com <br />kmk changed Inspection Date/Time from 10/26/2022 to 10/27/2022 <br />1. See previous corrections regarding special inspections. <br />2. Provide inspection report for change in structure above door <br />3. Complete mechanical and electrical inspections <br />(note: it appears your electrical inspection may have been called in on the wrong permit. Please straighten this out with the permit counter) <br />It t <br />Printed: Thursday, 01 June, 2023 2 of 3 FT <br />SUPERION <br />