Laserfiche WebLink
a. Not Applicable <br /> 11. Maintain BMPs <br /> a. BMP C150—Materials can be stored on hand within the construction area. <br /> 12. Manage the Project <br /> a. BMP C162—Site will be amended with crushed rock and graded initially. Anticipated <br /> construction during Summer 2021 to minimize runoff. <br /> 13. Protect Low Impact Development <br /> a. BMP C103—Temporary metal fence along alley on west side of project. <br /> b. BMP C233—Installation of waddles around perimeter of project. <br />