Laserfiche WebLink
iii <br /> not labeled accordingly, with partially overlapping information. The plans should clearly show the <br /> proposed work. <br /> 7. The Roof Framing Plan on Sheet S-6 appears to show that the fireplace will be removed and a new <br /> support beam added. The existing framing is indicated to run east-west and is presumed to have been <br /> interrupted by the fireplace penetrating the roof. The existing framing will not be supported by the <br /> new beam as shown, which is located at the center of the roof penetration, without modification. A <br /> more detailed roof framing plan should be submitted, including modifications to the existing framing <br /> as required. <br /> 8. Smoke and CO alarms should be shown throughout the house per IRC Sections R314 and R315. The <br /> alarms should be hardwired, interconnected, and provided with back-up battery power as required. <br /> 9. Handrails should be shown on all stairways, including exterior stairways. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> LiAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: M/W/Th/F: 7:30am-12:OOpm & 1:00pm-3:OOpm;Tu: 1:00pm-3:OOpm <br /> everettwa.gov I Facebook I Twitter <br /> COVID-19 Update: Please reference our website& online resources for updates to our service during the <br /> COVID-19 pandemic. We are currently experiencing a higher volume of calls and emails and have limited staff <br /> available to respond. Your patience is appreciated as we respond in the order received. <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 2 <br />