Laserfiche WebLink
74/ C1A/Y\-6 <br /> 1 l /(A4(', -, . 6 <br /> Tea Herman <br /> From: Philip Gerou <gerou.philip@gmail.com> <br /> Sent: Thursday, May 27, 2021 4:22 PM <br /> To: Drew Martin <br /> Cc: Grace Pollard; Kelsey Heyd;Alex Byrd;Tawnya Herman; Steve Hall <br /> Subject: Re: City of Everett Permit Services: 1130 75th ST SE (B2012-015) <br /> Hello, <br /> I've included Steve Hall in this email chain as he has assisted me in making some of the permit updates. He will be • <br /> responding to all of the items you called out. <br /> Thank you <br /> On Thu, May 27, 2021 at 1:56 PM Philip Gerou<gerou.philip@gmail.com>wrote: <br /> Thank you for the quick update and review. It's strange that they weren't showing since they were showing to me in <br /> the permit portal previously, but that mystery doesn't matter much since you have them. <br /> A couple of notes on your list. <br /> 6-The stairwell is not changing at all,that can be clarified on the notes <br /> 7-That ramp was torn out by the previous owner before I purchased the property <br /> On Thu, May 27, 2021 at 1:12 PM Drew Martin <dmartin@everettwa.gov>wrote: <br /> Hello, Philip. <br /> Thank you for forwarding these; I have placed a copy in the project folder. I do not see a record of receiving these <br /> drawings, but I have used them to perform another intake review. We revised the Trakit record yesterday to correct <br /> the entries to reflect the history of this project based on the documents in-hand. <br /> The drawings still require modifications. In addition to my original email,the following needs to be addressed: <br /> 1.The existing (as-built) plans should clearly indicate the existing walls that will be demolished. <br /> 2.The new (proposed) plans should clearly show the new walls. These should be delineated by shading the new <br /> walls (leave exiting walls unshaded), or another industry-standard method. <br /> 3.The basement of the house is not permitted as habitable space. The propose project includes providing a <br /> bedroom in the basement. The space needs to be insulated per the 2015 WSEC Chapter 4. Energy <br /> information is noted in the drawings, but the proposed insulation at all required wall and floor elements is not <br /> clear. In addition, energy credits are required per Section R406; a schedule of the selected credits should be <br /> stated in the drawings. The interior walls should comply with the requirements for exterior walls unless the <br /> entire basement is converted. Floor/ceiling and under(or over)slab insulation is also required. <br /> t = 4.The bedroom is below grade and appears to require a window well. Dimensions and details for both the egress <br /> window and window wall are required. See IRC Section R310. <br />