Laserfiche WebLink
James Bronder <br />From: James Bronder <br />Sent: Monday, August 8, 2022 2:24 PM <br />To: mtcurfman@snopud.com' <br />Subject: B2204-038 Follow-up Comments <br />Hi Mark, <br />I have some follow-up questions that would involve structural providing clarification. <br />1. On Sheet 52.1 of the plan set, there is a note of 125 psf Live Load (LL) to the south of the building. The same <br />hatch markings are also shown to the north of the building. Is the 125 psf LL intended to match in the north and <br />south portions given the same hatch area indicated? Currently, the northern portion of the building indicates a <br />100 psf LL. Should this northern portion also be shown as 125 psf LL? Please clarify. <br />2. The proposed change in space includes storage of utility meters on the 2nd floor with notes indicating stacking <br />limits. The reference drawing on the permit calculations notes that the original design live load is 50 psf office LL <br />+ 20 psf partitions (additional dead load). Please provide verification that the framing is able to support 100 psf <br />LL or 125 psf LL (dependent on the response from comment 1). Typically storage in a commercial buildings is <br />125 psf for a light warehouse type storage use. If the storage live load is less than 125 psf, please provide <br />calculations validating that the proposed design loading exceeds that of the maximum stacked pallets. <br />Thank you, <br />_ James Bronder, P.E., S.E. <br />- Associate Engineer— Plans Examiner I Permit Services <br />425.257.8810 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br />EVERETT Phone Hours: M/W/Th: 8 a.m. —12 p.m & 1 p.m. — 3 p.m. <br />everettwa.gov/permits I Facebook I Twitter <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br />Records Act. <br />