My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 75TH ST SW SNO CO PUD 2023-08-08
>
Address Records
>
75TH ST SW
>
1122
>
SNO CO PUD
>
1122 75TH ST SW SNO CO PUD 2023-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:58:06 PM
Creation date
7/31/2023 3:45:32 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1122
Tenant Name
SNO CO PUD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />E <br />f <br />James Bronder <br />From: Curfman, Mark <MTCurfman@Snopud.com> <br />Sent: Tuesday, August 30, 2022 9:21 AM <br />To: James Bronder <br />Cc: Anderson, Gillian; Hespe, George <br />Subject: [EXTERNAL] FW: B2204-038 follow-up Comments <br />Attachments: PUD 75th Street Business Center Structural Drawings 08.29.22.pdf, PUD 75th Street <br />Business Center Supplemental Calculations 08.29.22.pdf <br />CAUTION: This email originatedfrom outside of the organization. Do not click links or open attachments unless you <br />recognize the sender and know the content is safe. <br />From: Carolyn Jewett <CarolynJ@cgengineering.com> <br />Sent: Tuesday, August 30, 2022 8:40 AM <br />To: Tom Griffin <Tom@caparchgroup.com>; Joe Galusha <JGalusha@cgengineering.com>; Curfman, Mark <br /><MTCurfman@Snopud.com>; Sandra@caparchgroup.com <br />Cc: Josh Madison <JoshM@cgengineering.com> <br />Subject: RE: B2204-038 Follow-up Comments <br />Hi Tom, <br />Please see below for responses to the comments from the city of Everett. There was some confusion with the hatch on <br />our plan. Attached are our structural drawings with some clarification notes and our calculations for the analysis of the <br />2"d floor for the meter pallet storage. <br />4 Thank you, <br />ENGINEERING Carolyn Jewett, PE, SE, Senior Project Manager ECR <br />2�� <br />1997-2022 CG Engineering D E <br />p. 425.778.8500 <br />www.cgengineering.com AUG 3 n 2022 <br />CITY OF EVERETT <br />From: Tom Griffin <Tom@caparchgroup.com> Permit Services <br />Sent: Monday, August 8, 2022 6:29 PM <br />To: Carolyn Jewett <CarolynJ@cgengineering.com> <br />Cc: Joe Galusha <JGalusha@cRengineering.com>; Mark Curfman(MTCurfm@SNOPUD.com) <mtcurfm@snopud.com>; <br />Sandra Higgins <Sandra@caparchgroup.com> <br />Subject: FW: B2204-038 Follow-up Comments <br />Hi Carolyn, <br />Can you please review and address the two comments below from the city of Everett reviewer re the PUD Connect Up <br />75th St. Business Center project? Let me know if any additional questions. <br />Thanks <br />Tom Griffin - Project Manager <br />Capital Architects Group PC - 2813 Rockefeller Ave. Everett, WA 98201 - cell:: 425.246.4325 <br />11-_:� <br />
The URL can be used to link to this page
Your browser does not support the video tag.