Laserfiche WebLink
CARRIER: <br /> PROJECT SCOPE: <br /> I. —__- \..,.. . _-_ -_—.-.. - HEAVY SCOPE: SPRINT: <br /> • EXTEND H-FRAME (3'X6') <br /> / EXISTING OTHER \ , • INSTALL NEW GROUND BUSS BAR (TINNED); WITH TWO-HOLE LUGS; CONNECTED TO GROUND RING/ROD WITH #2 TINNED SOLID <br /> ______------- /��C�F CARRIER EQUIPMENT \ • INSTALL POWER AND GROUNDING TO THE NEW POWER J-BOX AND GROUNDING FROM THE GROUND BUSS BAR TO THE NEW NID (COILED FOR LATER Sprint> <br /> O'''39 EXISTING • INSTALL ±114' OFK FENCE (1)SHELTER TERMINATION). NEW2(1) 2" CONDUIT FROM NEW FIBER J-BOX TO EXISTIN" CONDUIT (NON-METALLIC SEAL TIGHT) FROM THE G CLEARWIRE CABINET POWER J-BOX TO THE GROUND BAR ON EXTENDED H-FRAME; UTILIZING #6 AWG <br /> CHAIN-LIN \ • INSTALL ±14' OF FIBER AND POWER THROUGH NEW (1) 2" CONDUIT FROM THE NEW (2) J-BOXES ON EXTENDED H-FRAME TO THE EXISTING CLEARWIRE CABINET <br /> / SPRINT TO EXTEND - • INSTALL (3) 1-1/4" CONDUIT (NON-METALLIC SEAL TIGHT) FROM THE NEW NID TO THE NEW (2) J-BOXES ON THE EXTENDED H-FRAME; (2) OF THE 1-1/4" • <br /> / H-FRAME (3'X6') \ CONDUITS WILL COME FROM NEW FIBER J-BOX TO NEW NID AND (1) 1-1 4" CONDUIT WILL COME FROM THE NEW POWER J-BOX TO THE NEW NID. <br /> / / PLAN PREPARED FOR: <br /> EXISTING H-FRAME PP • INSTALL (1)\ •• INSTALL (2) NEW/ JC BOXES,ONDUIT (NON-METALLIC <br /> FOR FIBER, WILL FOR POWER) AND 2" INTERCONNECTGROUND CONDUIT BETWS EEN THE NEW (2)R, CONTINUING TO THE JJ—BOXESTE BELOWUND NEWRNID/OND , <br /> EXISTING 155.-0" SELF ,- <br /> THE EXTENDED H—FRAME <br /> / SUPPORT TOWER �s` saow.HFLOoNsr. <br /> / / /j///� FV TO INSTALL NEW NID ON • INSTALL t278' OF NEW 3" CONDUIT WITH (2) 1" INNER—DUCTS FROM THE NEW FIBER J BOX ON EXTENDED H—FRAME TO THE PROPOSED MMP LOCATION 9rM DISO <br /> ov,e- /. 1IIl/l EXTENDED H-FRAME FIBER VENDOR: `� J CHICAGO.IL 80881 <br /> / V, / 1 ilk SPRINT TO INSTALL (2) NEW • INSTALL ±278' OF NEW FIBER THROUGH NEW 3" CONDUIT WITH (2) 1" INNER-DUCTS FROM THE NEW FIBER J-BOX ON EXTENDED H-FRAME TO THE PROPOSED WIRELESS 312 895.4977 <br /> /` �• , \• .' J-BOXES, 12"X12"X8", (1 FOR FIBER, MMP LOCATION ANOKIA"COMPANY <br /> / /F�a� �7 •�'� • •,�jt I1 FOR NTERCONNECT)CONDUIT BETWEEN THE • INSTALL NEW FIBER <br /> N D ON EXTENDED FROM H-FRA RESPECTIVE NEW J-BOXES AND GROUNDING TO THE NEW NID ' <br /> F AND 2" <br /> Ilk NEW (2) J-BOXES BELOW NEW NID • PROPOSED MMP IS LOCATED ON THE WEST SIDE OF 80TH STREET SW TO THE SOUTH SIDE OF A UTILITY POLE (VZ 275690) (49.92566', -122.24302') PLAN PREPARED BY: <br /> a� O ,ii ON THE EXTENDED H-FRAME POWER AVAILABILITY: <br /> /0* I - , , ��``���1 ��,- \ ••• -48 POWER DRAW AVAILABLE ` <br /> / •t <br /> SPRINT TO INSTALL (3) 1-1/4" PDP HAS 13 OPEN SLOTS FOR EXPANSIONLETS/CONDUIT (NON-METALLIC SEAL TIGHT) NO DC BREAKERS HAVE BEEN TURNED OFF <br /> SITE NOTES: LETS America Inc. <br /> r FROM THE NEW NID TO THE NEW (2) 1. SITE INFORMATION WAS PREPARED USING EXISTING DOCUMENTATION AND/OR SITE MEASUREMENTS AND SHOULD NOT BE INTERPRETED AS AN <br /> J-BOXES ON THE EXTENDED H-FRAME; ACCURATE BOUNDARY SURVEY. 112 S. KYRENE RD. STE. 1 <br /> EXISTING CLEARWIRE ' (2) OF THE 1-1/4" CONDUITS WILL 2. THIS SITE PLAN WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND IS SUBJECT TO ALL THE EASEMENTS AND RESTRICTIONS OF CHANDLER,AZ 85226 <br /> EQUIPMENT CABINET COME FROM NEW FIBER J-BOX TO RECORD. ARIZONA 480-961-9151 <br /> LETS PROJ. #: LETS-255-MW TO UT FIBER <br /> XISTING DOUBLE-SNG NEW NID AND (1) 1-1/4" CONDUIT 3. CONTRACTOR SHALL MAKE A UTILITY "ONE CALL" TO LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FORGATEWILL COME FROM THE NEW POWER COORDINATING A PRIVATE UTILITY LOCATE IF NEEDED TO DETERMINE THE UNDERGROUND STRUCTURES ON PRIVATE PROPERTY. THESE DRAWINGS DO IEVISIONS <br /> J-BOX TO THE NEW NID. NOT DEPICT ALL UNDERGROUND UTILITIES IN THE PROJECT AREA. R <br /> "( EXISTING ICE-BRIDGE 4. LATITUDE AND LONGITUDE COORDINATES ASSOCIATED WITH PROPOSED EQUIPMENT/INFRASTRUCTURE WERE BASED UPON GOOGLE EARTH AND WERE REV.! DATE DESCRIPTION NIWS <br /> SPRINT TO INSTALL t 14' OF NOT FIELD VERIFIED FOR PRECISION. THE EXACT LOCATION OF PROPOSED EQUIPMENT/INFRASTRUCTURE SHALL BE FIELD VERIFIED WITH SPRINT, A 10/02/18 90% CD'S RMD <br /> NEW (1) 2" CONDUIT FROM NEW SAC AND/OR FV. -- <br /> 771V <br /> FIBER J-BOX TO EXISTING B 01/17/191 95% CD'S BPS <br /> CLEARWIRE CABINET <br /> SPRINT TO INSTALL t14' OF FIBER SCALE 0 02/12/19 FOR CONSTRUCTION CMZ <br /> SPRINT TO INSTALL t278' OF NEW 3" AND POWER THROUGH NEW (1) 2" GENERAL NOTES N.T.S. 3 <br /> CONDUIT WITH (2) 1" INNER-DUCTS17 <br /> Z <br /> CONDUIT FROM THE NEW (2) <br /> FROM THE NEW FIBER J-BOX ONJ-BOXES ON EXTENDED H-FRAME <br /> TO THE EXISTING CLEARWIRE CABINET STANDARD LINES BUILDING WALLS I / itEXTENDED H-FRAME TO THE <br /> PROPOSED MMP LOCATION STING <br /> PARKING FIBER LINES — CHAIN-LINK FENCE X x x <br /> FY TO INSTALL t278' OF NEW FIBER AREA FIBER— uaEle <br /> LT <br /> THROUGH NEW 3" CONDUIT WITH <br /> (2) 1" INNER-DUCTS FROM THE NEW LEGEND SCALE 2 NOT FOR CONSTRUCTION UNLESS <br /> FIBER J-BOX ON EXTENDED H-FRAME n N.T.S. LABELED AS CONSTRUCTION SET <br /> TO THE PROPOSED MMP LOCATION t------- V • • <br /> SPRINT TO INSTALL t278' OF NEW 3" CONDUIT WITH <br /> I I (2) 1" INNER-DUCTS FROM THE NEW FIBER J-BOX ON <br /> \ \ \ \ \ \ \ \ <br /> j'r== == ='''' ''''===" <br /> EXTENDED H-FRAME TO THE PROPOSED MMP LOCATION v ••-,x^_ <br /> Vin <br /> I © FV TO INSTALL ±278' OF NEW FIBER THROUGH NEW 3" ... ,� ••�� ' CONDUIT WITH (2) 1" INNER-DUCTS FROM THE NEW '40.��,,� r t ,3 <br /> FIBER J-BOX ON EXTENDED H-FRAME TO THE PROPOSED l�.� �1M� <br /> MMP LOCATION a • <br /> D M'V, �: - <br /> \ EXISTING 155.-0" SELF SUPPORT TOWER " ?Q - O <br /> y,' I r SPRINT TO INSTALL ±14' OF NEW (1) 2" CONDUIT FROM SN Z• <br /> n NEW FIBER J-BOX TO EXISTING CLEARWIRE CABINET 0 r' <br /> V F '� ,/ SPRINT TO INSTALL t14' OF FIBER AND POWER �0: .4% 52811 �... <br /> , , THROUGH NEW (1) 2" CONDUIT FROM THE NEW "* •..?ISTE ••GQ� <br /> FIBER <br /> FIBER FIBER FIBER FIBE31 _ �--- - ---- - �� /% ` (2) J-BOXES ON EXTENDED H-FRAME TO THE SS,ONALEN <br /> _ -- - EXISTING CLEARWIRE CABINET <br /> _ - - ° FV TO INSTALL NEW NID ON f /12/19 <br /> - PROPERTY LINE <br /> ��NEW H-FRAME EXTENSION 9 HEREBY CERTIFY THAT THESE PLANS WERE <br /> .mow 1 t' PREPARED BY ME OR UNDER MY DIRECT <br /> SA SPRINT TO EXTEND SUPERVISION AND THAT I AM A DULY <br /> I . ,`- REGISTERED ENGINEER UNDER THE LAWS OF <br /> PROPOSED MMP IS LOCATED ON THE WEST -- 1 /,� . H-FRAME (3'X6') %- THE STATE IN OF WAUNDER <br /> THE <br /> SIDE OF BOTH STREET SW TO THE SOUTH SPRINT TO INSTALL (2) NEW J-BOXES, 12"X12"X8", <br /> SIDE OF A UTILITY POLE (VZ 275690) <br /> (49.92566, -122.24302') . (1 FOR FIBER, 1 FOR POWER) AND 2" INTERCONNECT SE52XC336 <br /> �' CONDUIT BETWEEN THE NEW (2) J-BOXES BELOW WA-SNO201 F18.1 <br /> �— `� NEW NID ON THE EXTENDED H-FRAME <br /> • <br /> TRAFFIC FLOW ` I SPRINT TO INSTALL (3) 1-1/4" CONDUIT 80TH SW AM.TOWER <br /> (NON-METALLIC SEAL TIGHT) FROM THE NEW NID TO 709 80TH SW <br /> I THE NEW (2) J-BOXES ON THE EXTENDED H-FRAME; EVERETT,WA 98023 <br /> CE 80TH ST. CE - - - _ I (2) OF THE 1-1/4" CONDUITS WILL COME FROM NEW SHEET TITLE: <br /> FIBER J-BOX TO NEW NID AND (1) 1-1/4" CONDUIT <br /> TRAFFIC FLOW WILL COME FROM THE NEW POWER J-BOX TO THE <br /> NEW NIDFV TO . CLEARWIRE <br /> NEW -BOXESL AND EGROUNDING TO THE R AND POWER MNEW NID <br /> TIVE MW-TO-LIT FIBER <br /> EXISTING CLEARWIRE SITE PLANS <br /> 7'-0" X 7'-0" LEASE AREA <br /> `I EXISTING CLEARWIRE <br /> >' EQUIPMENT CABINET 0 <br /> /--- --- _ __ SHEET NUMBER: <br /> 7. 4 NORTH NORTH A_1 <br /> OVERALL SITE PLAN 3®' SCALE:/64•==1'-0"11 x17)) 4 DETAILED SITE PLAN 0®' SCALE: 3/8'=1'-0' (22x34) <br /> (OR)3/64"=1'-O" (11 x17) (OR)3/16"=1'-0" (11x17) <br />