Laserfiche WebLink
McCann Structural BUILDING DEPARTMENT <br /> Solutions us ' +VIEW CO ENTS—. <br /> 2ndRESPONSE LETTER <br /> November 19, 2021 <br /> Rakeeb Khan <br /> Residential Plan Examiner <br /> City of Everett Permit Services 3200 Cedar Street <br /> Everett, WA 98201 _/EDE <br /> DEC 0 3 2021 <br /> CITY OF EVERET7` <br /> Subject: 1larpreet Bai Permit Services <br /> 2225 100th Street <br /> Everett, WA 98208 <br /> Plan Check Number: BW2012-004 <br /> Second Building Review <br /> MS2 Job #21-117 <br /> Dear Mr. Khan: <br /> Please find below my answers to the structural comments in your letter of <br /> October 18, 2021. They are answered sequentially. In addition to this letter <br /> and any additional calculations, a revised set of structural drawings has been <br /> attached per the comments below. <br /> 1. OK. MBR roof framing specified. Notes added to A2.0 "Proposed Roof <br /> Plan". <br /> 2. OK. Kitchen roof framing specified. Notes added to A2.0 "Proposed Roof <br /> Plan". Additional sections added to describe connections. <br /> 3. OK. Extra roof framing will be shown. Regarding the framing over the <br /> closed, the elevations on Sheet A2.1 are correct according to onsite pictures. <br /> The section cut B/AS2.2 will be corrected to match that. Roof Pitch already <br /> shown on Sheet A2.1 Proposed West Elevation will also be shown on B/A2.2 <br /> as 3/12. <br /> 4. Note that Section A/A2.2 is cut in the wrong direction on Sheet A2.0. This <br /> will be corrected. The closet framing will be specified. Notes added to <br /> 1/A2.2.. Also, the upper roof is not bearing on the lower roof. What you are <br /> \ i \o <br />