My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2653
>
Ordinances
>
Ordinance 2653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 2:47:53 PM
Creation date
8/4/2023 2:47:39 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2653
Date
8/7/1935
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ORDINANCE NO . 2653 . <br /> An Ordinance providing for the making of additions, betterments <br /> and extensions to the present water supply system of the City of Everett, <br /> by the construction of and the laying of a pipe line of suitable capaci- <br /> ty, and the furnishing and installation of appurtenances necessary to <br /> transmit a cross town extension of the Sultan pipe line No. 2 running <br /> from California. and Harrison Streets to a point on the southern boundary <br /> of'the pulp plant site owned by Weyerhaeuser Timber Company ,' a corpora- <br /> tion, of Everett, Snohomish County, Washington, which will conduct and <br /> deliver water and do all and everything necessary and needful in the <br /> furnishing of a water supply for a period of thirty years upon a meter- <br /> ed basis to said Weyerhaeuser Timber Company, a corporation, according <br /> to the terms and conditions of a written contract with said Company; to <br /> acquire by purchase and/'or condemnation or otherwise , lands, easements, <br /> rights of way, franchises, privileges and property necessary and con- <br /> venient for the proper construction, control , maintenance and. operation <br /> of said proposed additions, betterments and extensions to said water <br /> supply system; declaring the estimated cost thereof, as nearly as may <br /> be , providing for the payment thereof by cash derived from the sale of <br /> special water revenue fund bonds to be repaid out of revenues derived <br /> from the sale and disposition of water under the said contract with the <br /> Weyerhaeuser Timber Company to be kept in a separate fund until the <br /> costs and betterments herein provided have been paid in full , and de- <br /> claring an emergency. <br /> WHEREAS , it is deemed advisable by the City Council of the City of <br /> Everett that the said city shall make additions, betterments and exten- <br /> sions to its present water system, the same being necessary and needful <br /> in supplying and furnishing under its contract with the Weyerhaeuser <br /> Timber Company in the sale of surplus water as proposed above . NOW, <br /> THEREFORE , <br /> THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1. That the surplus water supply of Everett is sufficient <br /> to furnish a large quantity thereof for industrial uses and the need of <br /> additional revenue to its water department, the necessity of providing <br /> ways and means of meeting expenditures of maintenance and operation, the <br /> payment of a large bond issue, principal and interest , require the con- <br /> struction of additions , betterments and extensions to the city's exist- <br /> ing water system; that revenues derived from the sale of such surplus <br /> water will be sufficient to meet all payments and costs of installation <br /> and construction of the said extension now contemplated without resort <br /> to a general indebtedness obligation against the city from the sale of <br /> surplus water delivered to the Weyerhaeuser limber Company , a corpora- <br /> tion, including the additions and betterments at the rates charged and <br /> to be charged thereon, and will in the judgment of the City Council and <br /> the corporate authorities of said City, be sufficient to meet all expenses <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.