Laserfiche WebLink
GENERAL CONSTRUCTION NOTES: 22. PRIOR TO SUBMISSION OF BID,CONTRACTOR SHALL COORDINATE WITH VERIZON REP m <br /> TO DETERMINE IF ANY PERMITS WILL BE OBTAINED BY CONTRACTOR.ALL REQUIRED <br /> PERMITS NOT OBTAINED BY VERIZON MUST BE OBTAINED,AND PAID FOR,BY THE <br /> A . <br /> 1. OWNER FURNISHED MATERIALS,VERIZON'THE COMPANY"WILL PROVIDE AND THE CONTRACTOR. <br /> CONTRACTOR WILL INSTALL <br /> A BTS EQUIPMENT FRAME(PLATFORM)AND ICEBRIDGE SHELTER(GROUND 23. CONTRACTOR SHALL INSTALL ALL SITE SIGNAGE IN ACCORDANCE WITH VERIZON m <br /> BUILD/CO-LOCATE ONLY) SPECIFICATIONS AND REQUIREMENTS. . IE <br /> B. AC/TELCO INTERFACE BOX(PPC) AMERICAN TOWER* _ <br /> C. ICE BRIDGE(CABLE TRAY WITH COVER)(GROUND BUILD/CO-LOCATE ONLY,GC 24. CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS TO VERIZON FOR REVIEW AND TO FURNISH AND INSTALL FOR ROOFTOP INSTALLATION) APPROVAL PRIOR TO FABRICATION. ATC TOWER SERVICES,LLC L <br /> D. TOWERS,MONOPOLES <br /> E. TOWER LIGHTING --3500 REGENCY PARKWAY <br /> 25. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SUITE 100 a <br /> F. GENERATORS 8 LIQUID PROPANE TANK SPECIFICATIONS AND LOCATED ACCORDING TO VERIZON SPECIFICATIONS,AND AS CARY,NC 27618 <br /> G. ANTENNA STANDARD BRACKETS,FRAMES AND PIPES FOR MOUNTING SHOWN IN THESE PLANS. PHONE: 919 488-0112 1- <br /> H. ANTENNAS(INSTALLED BY OTHERS) <br /> I. TRANSMISSION LINE 26. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED HEREIN. COA:3408 0 <br /> J. TRANSMISSION LINE JUMPERS THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL THE CONSTRUCTION �' <br /> K TRANSMISSION LINE CONNECTORS WITH WEATHERPROOFING KITS MEANS,METHODS,TECHNIQUES,SEQUENCES AND PROCEDURES AND FOR <br /> L TRANSMISSION UNE GROUND KITS COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. <br /> M. HANGERS °i <br /> N. HOISTING GRIPS 27. CONTRACTOR SHALL NOTIFY VERIZON REP A MINIMUM OF 48 HOURS IN ADVANCE OF 0 a <br /> O. BTS EQUIPMENT POURING CONCRETE OR BACKFILLING ANY UNDERGROUND UTILITIES,FOUNDATIONS OR CORE ONEU <br /> SEALING ANY WALL,FLOOR OR ROOF PENETRATIONS FOR ENGINEERING REVIEW AND CONSULTING U S A <br /> 2. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL OTHER MATERIALS FOR THE APPROVAL <br /> COMPLETE INSTALLATION OF THE SITE INCLUDING,BUT NOT LIMITED TO,SUCH <br /> MATERIALS AS FENCING,STRUCTURAL STEEL SUPPORTING SUB-FRAME FOR PLATFORM, 28. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY INCLUDING COMPLIANCE WITH 4515 S.MCCLINTOCK DRIVE,SUITE 217 <br /> ROOFING LABOR AND MATERIALS,GROUNDING RINGS,GROUNDING WIRES, ALL APPLICABLE OSHA STANDARDS AND RECOMMENDATIONS AND SHALL PROVIDE ALL TEMPE,AZ 85282 <br /> COPPER-CLAD OR XIT CHEMICAL GROUND ROD(S),BUSS BARS,TRANSFORMERS AND NECESSARY SAFETY DEVICES INCLUDING PPE AND PPM AND CONSTRUCTION DEVICES <br /> DISCONNECT SWITCHES WHERE APPLICABLE,TEMPORARY ELECTRICAL POWER, SUCH AS WELDING AND FIRE PREVENTION,TEMPORARY SHORING,SCAFFOLDING, <br /> CONDUIT,LANDSCAPING COMPOUND STONE CRANES,CORE DRILLING,SLEEPERS AND TRENCH BOXES/SLOPING,BARRIERS,ETC. <br /> RUBBER MATTING,REPAR,CONCRETE CAISSONS,PADS AND/OR AUGER MOUNTS, <br /> MISCELLANEOUS FASTENERS,CABLE TRAYS,NONSTANDARD ANTENNA FRAMES AND REV. DESCRIPTION BY DATE <br /> ALL OTHER MATERIAL AND LABOR REQUIRED TO COMPLETE THE JOB ACCORDING TO 29. THE CONTRACTOR SHALL PROTECT AT HIS OWN EXPENSE,ALL EXISTING FACILITIES AND <br /> THE DRAWINGS AND SPECIFICATIONS.IT IS THE POSITION OF VERIZON TO APPLY FOR SUCH OF HIS NEW WORK LIABLE TO INJURY DURING THE CONSTRUCTION PERIOD.ANY QA PRELIM REG 07/14/21 <br /> PERMITTING AND CONTRACTOR RESPONSIBLE FOR PICKUP AND PAYMENT OF REQUIRED DAMAGE CAUSED BY NEGLECT ON THE PART OF THIS CONTRACTOR OR HIS <br /> PERMITS. REPRESENTATIVES,OR BY THE ELEMENTS DUE TO NEGLECT ON THE PART OF THIS 00 100°h CD REG 07/14/21 <br /> CONTRACTOR OR HIS REPRESENTATIVES,EITHER TO THE EXISTING WORK OR TO HIS A <br /> WORK OR THE WORK OF ANY OTHER CONTRACTOR,SHALL BE REPAIRED AT HIS <br /> 3. ALL WORK SHALL CONFORM TO ALL CURRENT APPLICABLE FEDERAL,STATE AND LOCAL EXPENSE TO THE OWNERS SATISFACTION. A <br /> - _ <br /> CODES,INCLUDING ANSVEIMIA-222,AND COMPLY WITH ATC CONSTRUCTION <br /> SPECIFICATIONS. <br /> 30. ALL WORK SHALL BE INSTALLED IN A FIRST CLASS,NEAT AND WORKMANLIKE MANNER A <br /> 4. CONTRACTOR SHALL CONTACT LOCAL 811 FOR IDENTIFICATION OF UNDERGROUND BY MECHANICS SKILLED IN THE TRADE INVOLVED.THE QUALITY OF WORKMANSHIP -. <br /> UTILITIES PRIOR START OF CONSTRUCTION. SHALL BE SUBJECT TO THE APPROVAL OF THE VERIZON REP.ANY WORK FOUND BY <br /> THE VERIZON REP TO BE OF INFERIOR QUALITY AND/OR WORKMANSHIP SHALL BE ATC SITE NUMBER: <br /> REPLACED AND/OR REWORKED AT CONTRACTOR EXPENSE UNTIL APPROVAL IS 83067 <br /> 5. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED OBTAINED. <br /> INSPECTIONS, <br /> 31. IN ORDER TO ESTABLISH STANDARDS OF QUALITY AND PERFORMANCE,ALL TYPES OF ATC SITE NAME: <br /> 6. ALL DIMENSIONS TO,OF,AND ON EXISTING BUILDINGS,DRAINAGE STRUCTURES,AND MATERIALS LISTED HEREINAFTER BY MANUFACTURER'S NAMES AND/OR SOUTH EVERETT <br /> SITE IMPROVEMENTS SHALL BE VERIFIED IN FIELD BY CONTRACTOR WITH ALL MANUFACTURER'S CATALOG NUMBER SHALL BE PROVIDED BY THESE MANUFACTURERS <br /> DISCREPANCIES REPORTED TO THE ENGINEER. AS SPECIFIED. <br /> 'VERIZON SITE NAME: <br /> 7. DO NOT CHANGE SIZE OR SPACING OF STRUCTURAL ELEMENTS. 32. VERIZON FURNISHED EQUIPMENT SHALL BE PICKED-UP AT THE VERIZON WAREHOUSE, <br /> NO LATER THAN 48HR AFTER BEING NOTIFIED INSURED,STORED,UNCRATE,PROTECTED WASE SOUTH EVERETT <br /> AND INSTALLED BY THE CONTRACTOR WITH ALL APPURTENANCES REQUIRED TO PLACE SITE ADDRESS: <br /> 8. DETAILS SHOWN ARE TYPICAL;SIMILAR DETAILS APPLY TO SIMILAR CONDITIONS UNLESS THE EQUIPMENT IN OPERATION,READY FOR USE.THE CONTRACTOR SHALL BE <br /> OTHERWISE NOTED. RESPONSIBLE FOR THE EQUIPMENT AFTER PICKING IT UP. 709 80ST SW <br /> EVERETT,WA 98203 <br /> 9. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION 33. VERIZON OR HIS ARCHITECT/ENGINEER RESERVES THE RIGHT TO REJECT ANY <br /> SAFETY WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. EQUIPMENT OR MATERIALS WHICH,IN HIS OWN OPINION ARE NOT IN COMPLIANCE WITH SEAL: <br /> THE CONTRACT DOCUMENTS,EITHER BEFORE OR AFTER INSTALLATION AND THE <br /> 10. CONTRACTOR SHALL BRACE STRUCTURES UNTIL ALL STRUCTURAL ELEMENTS NEEDED EQUIPMENT SHALL BE REPLACED WITH EQUIPMENT CONFORMING TO THE <br /> FOR STABILITY ARE INSTALLED.THESE ELEMENTS ARE AS FOLLOWS:LATERAL BRACING, REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE CONTRACTOR AT NO COST TO �� B G <br /> ANCHOR BOLTS,ETC. VERIZON OR THEIR ARCHITECT/ENGINEER. <br /> r� IN•• .\A <br /> 11. CONTRACTOR SHALL DETERMINE EXACT LOCATION OF EXISTING UTILITIES,GROUNDS SPECIAL CONSTRUCTION ��.-, -, C` <br /> DRAINS,DRAIN PIPES,VENTS,ETC.BEFORE COMMENCING WORKU.�` <br /> ANTENNA INSTALLATION NOTES: . q, z <br /> 12. INCORRECTLY FABRICATED,DAMAGED,OR OTHERWISE MISFITTING OR <br /> NONCONFORMING MATERIALS OR CONDITIONS SHALL BE REPORTED TO THE VERIZON 1 WORK INCLUDED: r� �jl�J ' <br /> REP PRIOR TO REMEDIAL OR CORRECTIVE ACTION.ANY SUCH REMEDIAL ACTION SHALL ``/r'�i <br /> REQUIRE WRITTEN APPROVAL BY THE VERIZON REP PRIOR TO PROCEEDING. \ ��°,).� <br /> A ANTENNA AND COAXIAL CABLES ARE FURNISHED BY VERIZON UNDER A '4 <br /> 13, EACH CONTRACTOR SHALL COOPERATE WITH THE VERIZON REP,AND COORDINATE HIS SEPARATE CONTRACT.THE CONTRACTOR SHALL ASSIST ANTENNA ),\ 56058 <br /> �c7� <br /> WORK WITH THE WORK OF OTHERS. INSTALLATION CONTRACTOR IN TERMS OD COORDINATION AND SITE ACCESS. v \if IE^ �Q <br /> ERECTION SUBCONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF �C`�\�/� ��C'� <br /> PERSONNEL AND EQUIPMENT. y V <br /> 14. CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED BY CONSTRUCTION OF THIS <br /> PROJECT TO MATCH EXISTING PRE-CONSTRUCTION CONDITIONS TO THE SATISFACTION B. INSTALL ANTENNA AS INDICATE ON DRAWINGS AND VERIZON SPECIFICATIONS. <br /> OF THE VERIZON CONSTRUCTION MANAGER. <br /> 15. ALL CABLE/CONDUIT ENTRY/EXIT PORTS SHALL BE WEATHERPROOFED DURING C. INSTALL GALVANIZED STEEL ANTENNA MOUNTS AS INDICATED ON DRAWINGS <br /> INSTALLATION USING A SILICONE SEALANT. <br /> D. INSTALL FURNISHED GALVANIZED STEEL OR ALUMINUM WAVEGUIDE. verizon1 <br /> 16. WHERE EXISTING CONDITIONS DO NOT MATCH THOSE SHOWN IN THIS PLAN SET, <br /> ‘i <br /> CONTRACTOR SHALL NOTIFY THE VERIZON REP AND ENGINEER OF RECORD E. CONTRACTOR SHALL PROVIDE FOUR(4)SETS OF SWEEP TESTS USING <br /> IMMEDIATELY. ANRITZU-PACKARD 8713B RF SCALAR NETWORK ANALYZER.SUBMIT FREQUENCY <br /> DOMAIN REFLECTOMETER(FDR)TESTS RESULTS TO THE PROJECT MANAGER. <br /> 17. CONTRACTOR SHALL ENSURE ALL SUBCONTRACTORS ARE PROVIDED WITH A COMPLETE SWEEP TESTS SHALL BE AS PER ATTACHED RFS"MINIMUM FIELD TESTING <br /> AND CURRENT SET OF DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT. RECOMMENDED FOR ANTENNA AND HELIAX COAXIAL CABLE SYSTEMS'DATED DATE DRAWN: 07/14/21 <br /> 10/5/93.TESTING SHALL BE PERFORMED BY AN INDEPENDENT TESTING SERVICE ATC JOB NO: 13671799_G5 <br /> AND BE BOUND AND SUBMITTED WITHIN ONE WEEK OF WORK COMPLETION. <br /> 18. CONTRACTOR SHALL REMOVE ALL RUBBISH AND DEBRIS FROM THE SITE AT THE END OF CUSTOMER ID: WASE SOUTH EVERETT <br /> EACH DAY. F. INSTALL COAXIAL CABLES AND TERMINATING BETWEEN ANTENNAS AND CUSTOMER#: 102287 <br /> EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS.WEATHERPROOF ALL <br /> 18. CONTRACTOR SHALL COORDINATE WORK SCHEDULE WITH AMERICAN TOWER CONNECTIONS BETWEEN THE ANTENNA AND EQUIPMENT PER MANUFACTURER'S <br /> CORPORATION(ATC)AND TAKE PRECAUTIONS TO MINIMIZE IMPACT AND DISRUPTION OF REQUIREMENTS.TERMINATE ALL COAXIAL CABLE THREE(3)FEET IN EXCESS OF <br /> OTHER OCCUPANTS OF THE FACILITY. ENTRY PORT LOCATION UNLESS OTHERWISE STATED. <br /> ALL DISCREPANCIES FROM WHAT IS SHOWN ON THESE GENERAL NOTES <br /> 20. CONTRACTOR SHALL FURNISH VERIZON AND AMERICAN TOWER CORPORATION(ATC) G. ANTENNA AND COAXIAL CABLE GROUNDING: CONSTRUCTION DRAWINGS SHALL BE COMMUNICATED TO ATC <br /> WITH A PDF MARKED UP AS-BUILT SET OF DRAWINGS UPON COMPLETION OF WORK. ENGINEERING IMMEDIATELY FOR CORRECTION OR RE-DESIGN. <br /> 2. ALL EXTERIOR#6 GREED GROUND WIRE"DAISY CHAIN"CONNECTIONS ARE TO BE FAILURE TO COMMUNICATE DIRECTLY WITH ATC ENGINEERING OR <br /> 21. PRIOR TO SUBMISSION OF BID,CONTRACTOR SHALL COORDINATE WITH VERIZON REP WEATHER SEALED WITH RFS CONNECTORS/SPLICE WEATHERPROOFING KIT 9221213 OR ANY CHANGES FROM THE DESIGN CONDUCTED WITHOUT PRIOR <br /> TO DETERMINE WHAT,IF ANY,ITEMS WILL BE PROVIDED.ALL ITEMS NOT PROVIDED EQUAL. SHEET NUMBER: REVISION: <br /> APPROVAL FROM ATC ENGINEERING SHALL BE THE SOLE <br /> SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR.CONTRACTOR WILL INSTALL RESPONSIBILITY OF THE GENERAL CONTRACTOR.ALL ITEMS PROVIDED. 3. ALL COAXIAL CABLE GROUNDING KITS ARE TO BE INSTALLED ON STRAIGHT RUNS OF G O O//�` 0 <br /> COAXIAL CABLE(NOT WITHIN BENDS) <br />