My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 72 00 - 44 <br /> 1 <br /> 11. DIFFERING SITE CONDITIONS <br /> Upon discovery and before such conditions are disturbed,the Contractor shall promptly provide Notice to <br /> the City's Representative of: <br /> 1. Pre-existing subsurface or latent physical conditions at the site differing materially from ' <br /> those indicated in this Contract,or <br /> 2. Pre-existing unknown physical conditions at the site,of an unusual nature,differing <br /> materially from those ordinarily encountered and generally recognized as inhering in <br /> work of the character provided for in this Contract. <br /> Upon written request,the City's Representative shall determine whether the actual conditions <br /> encountered by the Contractor conditions are materially different and,if so,are the cause of a material <br /> increase or decrease in the Contractor's cost of performance of the Work,or extend the duration of the <br /> critical path of the schedule. Upon such determination,the City's Representative will make an adjustment <br /> of Contract Sum or Contract Time,as appropriate. Extensions of Contract Time will be evaluated in 111 <br /> accordance with 5.2.2.2 Extensions of Contract Time. <br /> The City's Representative's determination that differing site conditions do not exist and/or the appropriate <br /> adjustment in Contract Sum or Contract Time(if any)shall be final. If there is a decrease in the cost or <br /> time required to perform the Work,failure of the Contractor to notify the City's Representative of the <br /> differing site condition shall not affect the City's right to make an adjustment in the Contract Sum or <br /> Contract Time. Additionally,no Contract Claim or adjustment of Contract Sum or Contract Time shall <br /> be allowed unless the Contractor has followed the procedures provided for in this Contract,including,but <br /> not limited to,furnishing timely Notice of the event and its effect on Contract Time and Contract Sum as <br /> required herein. <br /> Contractor shall in no event be entitled to a Contract Claim or adjustment of Contract Sum or Contract <br /> Time based on an allegation that the pre-existing subsurface or latent physical conditions at the site differ <br /> materially from those indicated in this Contract unless Contractor establishes that it reasonably relied on <br /> the conditions indicated in this Contract when making its bid,that the actual conditions encountered on <br /> the site differed materially from those indicated in this Contract,and that such materially-different <br /> conditions were not foreseeable at the time of its bid. <br /> 12. CONTRACT CLAIMS ' <br /> 12.1 GENERAL <br /> If the Contractor requests or believes for any reason that it is entitled to an adjustment of Contract Sum or <br /> Contract Time,or if the Contractor has a Dispute with the Owner and wants the Owner to take some <br /> action, or refrain from taking action,the Contractor shall file a Contract Claim as provided in this section. <br /> A timely and complete Contract Claim is a condition precedent to any entitlement by the Contractor to an <br /> adjustment of Contract Sum or Contract Time. No Contract Claim shall be allowed unless the Contractor <br /> has given Notice as required by 10. NOTICE TO OWNER and/or 11. DIFFERING SITE <br /> CONDITIONS and otherwise fully complies with the requirements of this section 12.CONTRACT <br /> CLAIMS. The Contractor waives any Contract Claim if: (a)Notice was not timely given in accordance <br /> with the requirements of 10. NOTICE TO OWNER and/or 11. DIFFERING SITE CONDITIONS; <br /> (b)the Owner's Representative is not afforded reasonable access by the Contractor to complete records, <br /> including,but not limited to, correspondence,job diaries,and actual cost and additional time incurred; (c) <br /> a Contract Claim is not timely filed as required by the General Conditions; or(d)adequate,accurate, <br /> contemporaneous and segregated supporting time and expense records are not kept and maintained. The <br /> fact that the Contractor provided proper and timely Notice,provided a properly filed Contract Claim,or <br /> provided the Owner's Representative access to records of actual cost,shall not in any way be construed as <br /> proving or substantiating the validity of the Contract Claim. If the Owner determines the Contract Claim <br /> has merit in whole or in part,the Owner's Representative will make an adjustment of Contract Sum or <br /> 00 72 00 - 44 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.