My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 11 00 - 1 <br /> SECTION 01 11 00 -SUMMARY OF WORK <br /> PART 1 - GENERAL <br /> 1.1 WORK COVERED BY THIS CONTRACT <br /> ' A. The Work includes, but not limited to, installation of six(6)300 kw inductive bus chargers <br /> at the College Station, Everett Station, and Seaway Transit Center at Everett, WA. <br /> ' B. JOB DESCRIPTION: The following is a general outline and is not intended to be a <br /> complete listing of the work to be accomplished nor is it intended to be used to indicate <br /> the order the work is to be completed. All items listed below is a general list of items <br /> ' included in the work and should be verified prior to bidding. The Work includes but is <br /> not limited to the supply and installation of all materials, equipment, and labor necessary <br /> to perform the work in full. <br /> C. Base Bid includes the following items: <br /> 1. Concrete work, sawing cutting, excavation, haul and restoration. <br /> 2. Installation of electrical equipment to connect to SnoPUD service. <br /> 3. Installation of inductive bus charger systems <br /> 4. Repairs to landscaping disturb during construction. <br /> 5. Site cleanup and restoration. <br /> ' D. Work under the Contract shall also include: <br /> 1. Protection of work in place and all stored items relating to the work. <br /> ' 2. Moving of any stored items or temporary facility where it interferes with work by <br /> the Owner or under separate contract. <br /> 3. Providing and paying for additional on-site or off-site storage facilities, work areas <br /> or parking needed for safe and efficient execution of the work or to meet other <br /> terms of the contract. <br /> ' 1.2 WORK BY OTHERS <br /> A. OTHER CONTRACTS: The Owner shall have the right to let other Contracts in <br /> connection with the Work, and the Contractor shall cooperate with any such Contractors. <br /> ' B. "N.I.C." Items indicated "NIC" shall be furnished and installed by the Owner, or by other <br /> Contracts. <br /> 1.3 WORK BY THE OWNER <br /> ' A. The Owner shall have the right to access the site and execute work not included in the <br /> Contract concurrent with this contract period. Contractor shall cooperate with such <br /> Owner sponsored efforts. <br /> ' 01 11 00 - 1 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.