My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 11 00 - 2 <br /> 1.4 PERMITS <br /> A. The Owner will pay the cost of the general plan review and building permit. The ' <br /> Contractor shall be responsible to obtain and pay the cost of various other permits and <br /> connection fees required such as mechanical, plumbing and electrical permits or <br /> connection fees and such shall be included in the Bid. <br /> 1.5 CODES AND STANDARD SPECIFICATIONS , <br /> A. All construction shall be in accordance with the International Building Code, Current <br /> Adopted Edition. <br /> B. All construction shall be in accordance with the Uniform Mechanical Code, Uniform <br /> Plumbing Code, Uniform Fire Code, and the Uniform Electrical Code, latest editions. <br /> C. All construction shall be in accordance with the Washington State Energy Code, latest <br /> editions. <br /> D. All construction shall be in accordance with the Everett Municipal Code Title 16. Latest ' <br /> editions. <br /> E. All construction shall be in conformance with the WSDOT/APWA Standard <br /> Specifications and Standard Plans, latest edition. <br /> F. All construction shall be in conformance with the City of Everett Design and Construction <br /> Standards and Specifications, latest edition. <br /> G. All work shall comply with applicable requirements of Snohomish County. <br /> H. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as Commercial Standard Federal Specifications, a trade association <br /> standard, or other similar standard, shall comply with the requirements of the latest ' <br /> revision thereof, and any amendment or supplement thereto in effect on the date of <br /> Invitation for Bids, except as limited to type, class or grade, or modified in such <br /> references. All work shall conform to the standard referred to, except as modified in <br /> these specifications and the drawings. <br /> 1.6 CONTRACTOR'S USE OF PREMISES ' <br /> A. The Contractor shall assume full responsibility for protection and safekeeping of products <br /> under this Contract. ' <br /> B. The Contractor shall obtain and pay for use of additional storage for work areas needed <br /> for operations. <br /> 1.7 CHECKING PLANS AND SPECIFICATIONS <br /> 01 11 00 -2 SUMMARY OF WORK ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.