My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett Inductive Charging Infrastructure for Field Installation 01 25 00 - 1 <br /> I <br /> I <br /> SECTION 01 25 00 -SUBSTITUTION PROCEDURES <br /> PART 1 - GENERAL <br /> I <br /> 1.1 GENERAL <br /> IA. This Section specifies administrative and procedural requirements governing the <br /> Contractor's selection of products for use in the project, and administrative procedures <br /> for handling requests for substitutions made after award of contract. <br /> I <br /> 1.2 DEFINITIONS <br /> IA. Definitions used in this paragraph are not intended to negate the meaning of other terms <br /> used in the contract documents. <br /> 1. "Products" are items purchased for incorporation in the work, regardless of <br /> whether they were specifically purchased for the project or taken from the <br /> Contractor's previously purchased stock. <br /> 2. "Named Products" are products identified by use of the manufacturer's name for a <br /> I product, including such items as a make or model designation, as recorded in <br /> published product literature, of the latest issue as of the date of the contract <br /> documents. <br /> I 3. "Materials" are products that must be substantially cut, shaped worked, mixed, <br /> finished, refined or to otherwise fabricated, processed, or installed to form units of <br /> work. <br /> 4. "Equipment" is defined as a product with operational parts, regardless of whether <br /> I motorized or manually operated, and in particular, a product that requires service <br /> connections such as wiring or piping. <br /> 5. The terms "equal", "or equal", "or approved equal" and "or approved" are <br /> I synonymous. All proposed "equal" products, materials, and equipment must be <br /> approved by the substitution request process. <br /> 1 1.3 QUALITY ASSURANCE <br /> A. SOURCE LIMITATIONS: Provide product of same kind, to fullest extent possible, from <br /> Ia single source. <br /> B. COMPATIBILITY OF OPTIONS: When Contractor is given the option of selecting <br /> I between two or more products for use on the Project, the product selected shall be <br /> compatible with products previously selected, even if previously selected products were <br /> also options. <br /> I C. NAME PLATES: Except for required labels and operating data, do not attach or imprint <br /> manufacturer's or producer's nameplates or trademark on surfaces of products which <br /> will be exposed to view in occupied spaces or on the exterior. <br /> I <br /> III01 25 00 - 1 SUBSTITUTION PROCEDURES <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.