My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett Inductive Charging Infrastructure for Field Installation 01 25 00 -2 <br /> 1. LABELS: Locate required product labels and stamps on a concealed surface or, <br /> where required for observation after installation, on an accessible surface that is <br /> not conspicuous. <br /> 1.4 SUBMITTALS I <br /> A. PRODUCT LISTING SUBMITTAL: Submit three (3) copies of the product-listing <br /> schedule within thirty (30) days after the date of commencement of the work. Provide a <br /> written explanation for omissions of data, and for known variations from contract <br /> requirements. At Contractor's option, initial submittal of the product-listing schedule may <br /> be limited to product selections and product designations that must be established early <br /> in the contract time. Submit completed product-listing schedule within sixty (60) days <br /> after commencement of the work. <br /> 1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING <br /> A. Deliver, store, and handle products in accordance with the manufacturer's <br /> recommendations, using means and method that will prevent damage, deterioration and <br /> loss, including theft. <br /> B. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding <br /> of construction spaces. <br /> C. Coordinate delivery with installation time to ensure minimum holding time for items that <br /> are flammable, hazardous, easily damaged, or sensitive to deterioration, theft and other <br /> losses. <br /> D. Deliver products to the site in the manufacturer's original sealed container or other I <br /> packaging system, complete with labels and instruction for handling, storing, unpacking, <br /> protecting and installing. <br /> E. Inspect products upon delivery to ensure compliance with the contract documents, and <br /> to ensure that products are undamaged and properly protected. <br /> F. Store products at the site in a manner that will facilitate inspection and measurement of I <br /> quantity or counting of units. <br /> G. Store heavy materials away from the project structure in a manner that will not endanger 1 <br /> the supporting construction. <br /> H. Store products subject to damage by the elements above ground, under cover in a <br /> weather-tight enclosure, with ventilation adequate to prevent condensation. Maintain <br /> temperature and humidity within range required by manufacturer's instructions. <br /> I. OFF-SITE STORAGE: If requested by the Contractor and approved in writing by the 1 <br /> Owner, the Owner may make payment to the Contractor for products stored off-site. <br /> J. OWNER-FURNISHED MATERIALS: When materials or equipment furnished by the , <br /> Owner for installation by the Contractor are to be delivered and stored prior to installation, <br /> 01 25 00 -2 SUBSTITUTION PROCEDURES , <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.