Laserfiche WebLink
I <br /> City of Everett Inductive Charging Infrastructure for Field Installation 01 31 19 - 3 <br /> I <br /> 16. Review project safety. <br /> I <br /> 17. Review any other business. <br /> 1.3 PRE-INSTALLATION MEETINGS <br /> IA. These meetings will be held a min of 10 days prior to beginning work on each work <br /> discipline as identified within these specifications. These meetings shall take place <br /> I following the regular progress meetings or as agreed. Contractor is responsible to <br /> schedule and administer these meetings. <br /> B. Suggested Meetings:I <br /> 1. Construction Area Access. <br /> 2. Demolition. <br /> 3. Concrete. <br /> I 4. Storm Drainage <br /> 5. Synthetic Turf <br /> 6. Irrigation <br /> IC. Attendees: <br /> 1. Architect and Architect's consultants as appropriate. <br /> 2. Contractor's Superintendent. <br /> I 3. Subcontractor as appropriate. <br /> 4. Foreman supervising work. <br /> 5. Others as appropriate. <br /> ID. Agenda: <br /> 1. Submittals-Approved? Review contract requirements. <br /> 2. Materials-available and ready for use. <br /> I3. Persons responsible for work. <br /> 4. Test-required tests,who samples and how often? Criteria for performance of work. <br /> 5. Safety. <br /> 6. Substrate-criteria for approving substrate. <br /> E. Contractor shall record, reproduce and distribute copies of minutes within three (3) <br /> days of each meeting to all meeting participants. <br /> I <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> I <br /> END OF SECTION 01 31 19 <br /> I <br /> I <br /> I01 31 19 - 3 PROJECT MEETINGS <br />