My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 31 19 -2 <br /> 5. Payments: <br /> a. Schedule of Values. <br /> b. Progress payment review at Project Site. <br /> c. Monthly progress payment cut-off date. <br /> 6. Site Visits: <br /> a. Dates and times of Engineer's visits. <br /> b. Engineer's visit report. <br /> 7. Record Documents. <br /> 8. Finish and Coordination. ' <br /> 9. Notice to Proceed. <br /> 10. Other Topics as Appropriate to Project. <br /> D. Engineer will record minutes and issue copies to all in attendance. ' <br /> 1.2 PROGRESS MEETINGS 1 <br /> A. Meeting Location: Contractor's project field office, unless otherwise agreed. <br /> B. Attendance shall include Owner, Architect, Contractor, Project Superintendent, and ' <br /> others as appropriate to agenda for each meeting. <br /> C. The Contractor shall: ' <br /> 1. Prepare agenda and administer progress meetings, and specially called meetings <br /> throughout work progress. <br /> 2. Preside at meetings. <br /> 3. Record minutes; include all significant proceedings and decisions. <br /> 4. Reproduce and distribute copies of minutes within three (3) days of each meeting <br /> to all meeting participants. <br /> 5. Ascertain that work is prosecuted consistently with contract documents and <br /> construction schedules. <br /> D. SUGGESTED AGENDA: <br /> 1. Review and approve minutes of previous meeting. <br /> 2. Review work progress since previous meeting. <br /> 3. Review plans for progress for succeeding work period. <br /> 4. Review construction schedule. <br /> 5. Present corrective measures and procedures to regain project schedule, as <br /> applicable. <br /> 6. Present field observations, problems, and conflicts. <br /> 7. Discuss problems impeding progress schedule. <br /> 8. Review Quantity Control. <br /> 9. Review submittal schedules; present methods to expedite as required. <br /> 10. Review off-site fabrication. <br /> 11. Review delivery schedules. <br /> 12. Coordinate work. 111 <br /> 13. Review proposed changes for: <br /> a. Effect on construction schedule and on completion date. <br /> b. Effect on any other contracts of the project. <br /> 14. Review draft of application for payment (at end of month). 111 <br /> 15. Review required revisions to project record documents. <br /> 01 31 19 -2 PROJECT MEETINGS , <br />
The URL can be used to link to this page
Your browser does not support the video tag.