My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 32 16 - 1 <br /> SECTION 01 32 16 - CONSTRUCTION PROGRESS SCHEDULE <br /> PART 1 - GENERAL <br /> 1 <br /> 1.1 CONSTRUCTION SCHEDULE <br /> A. The Contractor shall prepare a construction schedule showing all tasks required to <br /> perform the work. Schedule shall show all tasks performed by all trades that is required <br /> to perform work within the contract time. The Schedule shall include sufficient time for <br /> ' cleaning, punch list review and completion of punch list items prior to the designated <br /> physical completion date. <br /> 1.2 FORMAT <br /> ' A. The Schedule shall be a critical path method Gantt chart style, preferably Microsoft <br /> Project. <br /> B. The Schedule shall clearly identify all work and detailed to show specific steps to perform <br /> work. The relationship between the work items shall show the starting date, length of <br /> time required to perform work, completion of the work within the time frame shown. <br /> ' C. All work found on the schedule of values shall be clearly identified. Unless otherwise <br /> expressly authorized in writing by the Owner's representative, the Contractor must <br /> integrate the schedules with the Schedule of Values and unit price items so that each <br /> construction activity is represented by a dollar value. <br /> D. Submittals dates shall be included and the relationship between submittal and the work <br /> item shall be identified <br /> ' E. Materials requiring long lead times shall be clearly identified on the schedule. This shall <br /> include: <br /> ' 1. Date materials musts be ordered <br /> 2. Time for manufacturing <br /> 3. Time for delivery <br /> 4. Delivery date (expected date materials to be at the project) <br /> 5. Date of Installation <br /> ' 1.3 SUBMITTAL <br /> A. At the pre-construction meeting, a preliminary schedule is required to be submitted. <br /> Once the preliminary schedule has been approved, the schedule shall become the <br /> ' Project Schedule. The Project Schedule, as approved by the Owner, will be an integral <br /> part of the contract and will establish interim completion dates for the various activities <br /> under the contract. <br /> 01 32 16 - 1 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.