My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 32 16 -2 <br /> B. Schedule shall be submitted electronic. Acceptable format .mmp or as otherwise <br /> approved by Owner. <br /> C. Review by the Owner or Owner's Representative shall not constitute approval or <br /> acceptance of the Contractor's construction means, methods, sequencing, logic, order, <br /> precedence and succession of activities or Contractor's ability to complete the Work in a <br /> timely manner. <br /> D. The review/approval of any schedule shall not transfer any of the Contractor's <br /> responsibilities to the Owner. <br /> E. Subcontractors shall review all schedules prior to submittal. At the Owner's option and <br /> sole discretion, Owner may require Contractor to obtain written acceptance of each <br /> schedule by subcontractors as practical and feasible, as the schedule relates to <br /> subcontractors' work. <br /> 1.4 UPDATES <br /> A. The Project Construction Schedule will be reviewed and updated at each progress , <br /> meeting. All changes to the project schedule of more than three (3) working days shall <br /> be documented. The Schedule shall be updated to show measures required to bring <br /> project back on schedule. The Contractor alone shall remain responsible for adjusting <br /> forces, equipment, and work schedules to ensure completion of the work within the <br /> Contract Time. Any mistakes or errors in any schedule, including, but not limited to, <br /> mistakes or errors of logic, order, precedence, and duration, are and remain the ' <br /> Contractor's. <br /> B. Should any activity not be completed by the stated scheduled date, the Owner will have <br /> the right to require the Contractor to expedite completion of the activity by whatever <br /> means appropriate and necessary, without additional compensation to the Contractor. <br /> C. The Schedule shall be used to justify time extension days requested by the Contractor. ' <br /> For additional days requested,the Schedule shall be detailed enough to identify the work <br /> item(s) affected and the relationship to the changed or added work. <br /> D. Schedule shall be provided during the construction meetings. Schedule shall be on ' <br /> 11x17 paper or as otherwise approved by Owner and shall show current work progress. <br /> 1.5 OWNER PROVIDED MATERIALS <br /> A. All items to be provided by the Owner shall be incorporated into the schedule. The <br /> schedule shall show when the materials are required to be delivered to the project and <br /> when the materials will be installed. These materials are to be included in the preliminary <br /> schedule, upon review; owner will confirm lead time for materials and delivery dates. ' <br /> B. Contractor failure to include owner provided materials into the schedule shall be <br /> responsible for all delays to the work or failure to notify the owner of tasks dependent <br /> upon the owner furnished materials shall constitute a waiver by the contractor of any ' <br /> 01 32 16 - 2 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.