My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cityof Everett -Inductive Charging Infrastructure for Field Installation 00 72 00i <br /> I <br /> SECTION 00 72 00 <br /> I GENERAL CONDITIONS <br /> CONTENTS <br /> I 1. GENERAL INFORMATION 1 <br /> 1.1 Definitions of Words and Terms 1 <br /> 1.2. Contract Documents 5 <br /> I <br /> 2. SPECIFICATIONS AND DRAWINGS 5 <br /> 2.1. Interpretation of Specifications and Drawings 5 <br /> I 2.2. Division of Specifications and Drawings 6 <br /> 2.3. Discrepancies in Specifications and Drawings 6 <br /> 2.3.1. Errors and Omissions 6 <br /> I 2.3.2. Conflicting Provisions 7 <br /> 2.3.3. Utilities 7 <br /> 2.3.3.1 General 7 <br /> I 2.3.3.2 Known Utilities 7 <br /> 2.3.3.3 Service Connections 7 <br /> 2.3.3.4 Unknown Utilities 8 <br /> I 2.4. Submittals 8 <br /> 2.5. Contractor's Copies of Contract Documents 8 <br /> 3. OWNER 8 <br /> 1 3.1. General 8 <br /> 3.2. Owner's Representative 9 <br /> I 4. CONTRACTOR 10 <br /> 4.1. Contractor's Representative 10 <br /> 4.2. Construction Procedures 11 <br /> I 4.3. Subcontractors 11 <br /> 4.4. Responsibilities 12 <br /> 4.4.1. Subcontractors,Manufacturers and Suppliers 12 <br /> I 4.4.2. Contractor's Employees 12 <br /> 4.4.3. Payment for Labor and Materials 12 <br /> 4.4.4. Attention to Work 12 <br /> 4.4.5. Safety 12 <br /> 4.4.6. Threats,Intimidation and Harassment Forbidden 13 <br /> 4.4.7. Weapons Forbidden 13 <br /> 111 <br /> 4.4.8. Safety Standards 13 <br /> 4.4.9. Public Safety and Convenience 13 <br /> 4.4.10.Access to Work 13 <br /> I4.4.11. Emergencies 14 <br /> 4.4.12. Trench Excavation 14 <br /> 4.5. Owner-Contractor Coordination 14 <br /> I4.5.1. Service of Notice 14 <br /> 4.5.2. Suggestions to Contractor 14 <br /> 1 00 72 00 - i GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.