Laserfiche WebLink
I <br /> City of Everett Inductive Charging Infrastructure for Field Installation 00 72 00 - ii <br /> I <br /> 4.5.3 Meetings with Owner 14 <br /> 4.5.4. Cooperation with Others 15 <br /> 5. PROGRESS AND COMPLETION 15 <br /> 5.1. Notice to Proceed 15 I <br /> 5.2. Contract Time 15 <br /> 5.2.1. General 15 <br /> 5.2.2. Construction Schedule 16 I <br /> 5.2.2.1 General 16 <br /> 5.2.2.2 Extensions of Contract Time 17 <br /> 5.2.3. Construction Progress 17 <br /> 5.2.4. Delays 18 <br /> 5.2.4.1 General 18 <br /> 5.2.4.2 Bonuses 18 I <br /> 5.3. Suspension Procedures 18 <br /> 5.4. Termination Procedures 18 <br /> 5.4.1. Termination by Owner for Default 18 I <br /> 5.4.2. Termination for Convenience 19 <br /> 5.4.3. Termination by Contractor after Suspension 19 <br /> 5.4.4. Contractor Obligations upon Termination 20 I <br /> 5.4.5. Ownership of Materials upon Termination 20 <br /> 5.4.6. Opportunity to Cure 20 <br /> 5.4.7 Waiver of Remedies for Any Breach 20 <br /> 5.5. Possession and Use of Completed Portions of the Work 20 <br /> 5.6. Possession of Incomplete Portions of the Project 20 <br /> 5.7. Substantial Completion 21 I <br /> 5.8. Acceptance of Work 21 <br /> 6. CHANGES 21 I <br /> 6.1 Owner's Right to Direct Changes to the Work 21 <br /> 6.2 Extra Work 22 <br /> 6.3 Change Orders 22 <br /> 6.4 Value Engineering and Cost Sharing 22 <br /> 7. LABOR STANDARDS 23 <br /> 7.1. Wages of Employees 23 I <br /> 7.1.1. General 23 <br /> 7.1.2. Contractor's Responsibility 23 I <br /> 7.1.3. Federal Labor Requirements 23 <br /> 7.2. Payment Certificates 24 <br /> 7.3. Hours of Labor 24 I <br /> 7.4. Contract Work Hours 24 <br /> 7.5. Overtime Work 24 <br /> 7.6 Labor Relations 24 111 <br /> 8. MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES 25 <br /> 00 72 00 - ii GENERAL CONDITIONS I <br /> I <br />