My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cityof Everett Inductive -Charging Infrastructure for Field Installation 00 72 00III <br /> 1 <br /> 8.1. General 25 <br /> I 8.2. Product Data 25 <br /> 8.3. Quality 25 <br /> 8.4. Material and Equipment Specified by Name 25 <br /> I 8.5. Requests for Substitution 26 <br /> 8.6. Demonstration of Compliance with Contract Requirements 26 <br /> 8.6.1. Inspection 26 <br /> I 8.6.2. Samples of Materials 26 <br /> 8.6.3. Certification 27 <br /> 8.6.4. Inspection at Point of Manufacturing 27 <br /> I8.6.5. Testing and Commissioning of Completed Work 27 <br /> 8.6.6. Storage of Materials and Equipment 27 <br /> 8.6.7. Manufacturer's Directions 27' <br /> 8.7. Defective Work 27 <br /> 8.7.1. Correction of Defective Work 27 <br /> 8.7.2. Retention of Defective Work 28 <br /> I <br /> 8.8. Materials and Equipment Furnished by Owner 28 <br /> 8.9. Guarantee 28 <br /> I 8.10. Correction Period 28 <br /> 9. MEASUREMENT AND PAYMENT 29 <br /> 9.1. Payments to Contractor 29 <br /> I 9.1.1. Schedule of Values 29 <br /> 9.1.2. Progress Payments 30 <br /> 9.1.2.1 Payment Request Procedures: 30 <br /> I 9.1.2.2 Review Procedures. 30 <br /> 9.1.2.3 Retained Percentage 30 <br /> 9.1.2.4 Withholding 30 <br /> I9.1.3. Final Payment 31 <br /> 9.2. Payment for Changes 32 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 32 <br /> I <br /> 9.2.1.1. Increased Quantities 32 <br /> 9.2.1.2. Decreased Quantities 32 <br /> 9.2.1.3. Limitations 32 <br /> I <br /> 9.2.2. Changes in Work Not Covered By Unit Prices 32 <br /> 9.2.3. Deleted Work 33 <br /> 9.3. Charges to Contractor 33 <br /> I9.4. Compensation to Owner for Time Extension 34 <br /> 9.5. Adjustment of Contract Sum 34 <br /> I 9.5.1 Calculation 34 <br /> 9.5.2 Limitations 34 <br /> 9.5.3 Unabsorbed and Extended Overhead 35 <br /> I 9.6. Force Account 35 <br /> 9.6.1 Labor. 36 <br /> I00 72 00 - iii GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.