My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 72 00 - 28 <br /> Contractor shall be liable for all Delays and costs,including costs to the Owner,and actual damages <br /> resulting from the relocation,rerouting,Delays or actions required to maintain the uninterrupted progress <br /> of the Work. Failure by the Contractor to take the actions described above or to comply with the <br /> directives of the Owner shall be considered a breach of this Contract and the Owner may terminate the <br /> Contract or suspend the Contractor as provided in this Contract. I <br /> 8. MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES <br /> 8.1. GENERAL <br /> Unless otherwise specifically stated in the Contract Documents,the Contractor shall provide and pay for <br /> materials,labor,tools,Equipment,water,light,power,transportation,supervision, and temporary <br /> construction of any nature,and other services and facilities of any nature,whatsoever necessary,to <br /> execute,complete and deliver the Work within the specified time. Contractor shall be liable for all power <br /> and water costs until Substantial Completion,whether such power or water is provided by temporary or <br /> permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the <br /> availability or lack of availability of permanent power or utilities. Material and Equipment shall be new <br /> and of the specified quality. Equipment offered shall be new or current specified models. This <br /> requirement does not apply to minor details,or to thoroughly demonstrated improvements in design or in <br /> materials of construction. Construction Work shall be executed in conformity with the standard practice <br /> of the trade. <br /> 8.2. PRODUCT DATA I <br /> When specified,the Contractor shall provide data required for inspecting,testing,operating,or <br /> maintaining parts of the Work. Unless otherwise specified,such data shall be provided at the time the <br /> referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall <br /> include,unless otherwise specified, such items as shop drawings,erection drawings,reinforcing steel <br /> schedules,testing and adjusting instructions,operations manuals,maintenance procedures,parts lists, and <br /> record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability <br /> determined by the Owner in its sole discretion. <br /> 8.3. QUALITY <br /> Where detailed Specifications of materials,Equipment,or construction Work are not set forth,the <br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the <br /> materials and workmanship specified for the other parts of the Work,from firms of established good <br /> reputations,and shall follow standard practices to perform construction Work of good quality in a <br /> workmanlike way. Work performed shall be in conformity and harmony with the intent to secure the <br /> standard of construction and Equipment of Work as a whole and in part. All Work must comply and <br /> conform to ap <br /> plicable buildingco <br /> des in effect <br /> when the Work is performed. <br /> 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br /> When material or Equipment is specified by reference to patents,brand names,or catalog numbers,the <br /> Owner will not usually consider or approve a substitution. However,the Contractor may offer <br /> substitutions of products it considers to be equal to that specified,but the Owner is not obliged or required <br /> to consider or accept such offered substitution. <br /> 8.5. REQUESTS FOR SUBSTITUTION <br /> The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's offers of <br /> substitution shall be made in writing to the Owner's Representative and shall include sufficient data to <br /> enable the Owner's Representative to assess the acceptability of the material or Equipment for the <br /> particular application and requirements. The Owner and Owner's Representative are not required or <br /> 00 72 00 - 28 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.