My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 27 <br /> I <br /> Payrolls may be submitted on Federal payroll form WH-347,or equivalent. The reverse side of the form <br /> I contains an affidavit that shall be filled out and signed. If the Contractor's payroll reports are <br /> computerized,the computerized reports may be submitted along with a Statement of Compliance affidavit <br /> photo copied from the back of form WH-347,or equivalent. <br /> I The first payroll submitted for the Work for both the Contractor and each Subcontractor shall be labeled <br /> "Initial." The last payroll submitted for the Work for both the Contractor and each Subcontractor shall be <br /> labeled"Final." Payrolls shall be sequentially numbered for all periods in which Work has been done.A <br /> I certificate of completion for the Work, signed by the City,will constitute acceptance of the Work. The <br /> issuance of this certificate of completion will not constitute acceptance of unauthorized or defective Work <br /> or material is performed. <br /> I7.3. HOURS OF LABOR <br /> Contractor shall comply with all applicable laws and regulations regarding hours of work,including,but <br /> not limited to,RCW Chap.49.28. <br /> I7.4. CONTRACT WORK HOURS <br /> The Contractor shall comply with Section 103 of the Contract Work Hours and Safety Standards Act(40 <br /> I U.S.C. section 327-330)as supplemented by Department of Labor Regulations(29 CFR,Part 5). Under <br /> this section the Contractor shall compute the wages of every mechanic and laborer on the basis of a <br /> standard work week of forty(40)hours. Work in excess of the standard work week is permissible, <br /> provided the worker is compensated as required by law. <br /> I7.5. OVERTIME WORK <br /> Overtime and shift work may be established as a regular procedure by the Contractor with reasonable <br /> I Notice to and written permission of the Owner's Representative. Permission may be denied for such <br /> reasons as noise,traffic,or other interference with the neighborhood in which the Project is located,or the <br /> lack of availability of inspectors during overtime or shift work. <br /> I7.6 LABOR RELATIONS <br /> The Contractor shall take all reasonable steps to prevent any labor Disputes involving the Contractor and <br /> any of its Subcontractors or Suppliers of any products or services from disrupting the Work under this <br /> I <br /> , Contract or interfering with access to the Owner's property by the Owner, including its agents, <br /> representatives,employees and officials, any other contractors engaged in construction activities,or <br /> members of the public. In the event any picketing or other concerted activity by employees involved in a <br /> I labor Dispute with the Contractor or its Subcontractors or Suppliers interferes in any way with access to <br /> the Owner's property by any persons,the Contractor shall promptly and expeditiously take all reasonable <br /> actions to eliminate or minimize such interference,including but not limited to: (1)utilizing all <br /> I reasonable means of restricting any picketing to a single entrance to the Owner's property; (2)posting <br /> notices or signs which advise interested persons and labor organizations that a particular entrance to the <br /> Owner's property is for the employees of"primary" or,as the case may be, "neutral" employers; (3) <br /> Ipolicing entrances to ensure that only authorized personnel may use those entrances; (4)notifying all <br /> interested labor organizations of the "primary"or"neutral" status of particular entrances; and(5)in the <br /> event any such picketing or concerted activity is unlawful or has a secondary impact upon the employees <br /> of neutral employers,promptly and expeditiously taking appropriate action to seek recourse through the <br /> I appropriate governmental agency or state or federal courts to limit the location of such picketing so as to <br /> reduce the impact thereof upon neutral employers. <br /> The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render <br /> Iassistance as may be in the best interests of the Owner. However,the Owner shall have the right to direct <br /> the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to <br /> overrule such actions,to designate the entrances to be used as"primary" or"neutral" entrances,and to <br /> take appropriate legal action in order to protect the Owner's property and interests. In any event,the <br /> 00 72 00 - 27 GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.