Laserfiche WebLink
• 0 <br /> James Bronder <br /> From: James Bronder <br /> Sent: Monday, March 14, 2022 1:47 PM <br /> To: dough@dykeman.net <br /> Subject: Correction Notice 1 - B2203-023 <br /> Doug, <br /> Please respond to the comments below at your convenience: <br /> 1. On Sheet G0.2, callouts on the drawings refer to details Al,A2 on A8.10, but do not appear to be provided on <br /> the drawing set. Please clarify. <br /> 2. The Type of Construction on the set is indicated to be V-lhour. Per IBC 705.2.3.1, balconies and similar <br /> projections are required to meet the fire-resistive construction for floor construction of that Type. It is unclear if <br /> 'the repair to the assembly will include replacement of floor assembly construction materials. If so, please <br /> indicate a floor assembly listing that maintains the fire-resistive construction requirements. <br /> Thank you, <br /> James Bronder, P.E.,S.E. <br /> Li <br /> II. Associate Engineer—Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />