My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/08/23 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/08/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 3:20:59 PM
Creation date
8/23/2023 5:53:16 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Everett Transit 2023 TDP DRAFT 13 <br />2025 <br />SERVICES • Service adjustments for schedule integrity and delivery optimization <br />FACILITIES <br />• Expand electric bus chargers and infrastructure at the operations center <br />• Everett Station complete upgrade of fire alarm control panels <br />• Install electronic wayfinding signage at College Station and Mall Station <br />• Everett station sidewalk rehabilitation <br />• Continue replacing passenger amenities to current standard <br />• Complete replacement of HVAC system at Everett Station <br />• Everett Station repair or replace granite walkway <br />• Complete study and PE for replacement of maintenance shop for electric vehicles <br />EQUIPMENT • Replace fourteen fixed-route buses with electric buses <br />• Replace three paratransit vehicles with electric if feasible <br />2026 <br />SERVICES • Fixed route service adjustments for schedule integrity and delivery optimization <br />• Micro-transit pilot project contingent upon award of discretionary grant funding <br />FACILITIES <br />• Everett Station replace PA system <br />• Continue shelter replacements and bus stop improvements as identified <br />• Begin replacement of vehicle maintenance shop contingent on success with grant <br />awards and/or loans <br />EQUIPMENT • Replace four fixed-route buses with electric buses <br />• Replace four paratransit vehicles with electric buses if feasible <br />2027 <br />SERVICES • Fixed route service adjustments for schedule integrity and delivery optimization. <br />FACILITIES • Continue replacement of electric vehicle maintenance shop <br />• Continue shelter replacements and bus stop improvements as identified <br />EQUIPMENT • Replace nine paratransit vehicles with electric if feasible <br />• Replace four fixed route buses with electric <br />2028 <br />SERVICES • Fixed route service adjustments for schedule integrity and delivery optimization. <br />FACILITIES <br />• Everett Station replace lighting for Great Hall and Conference Center <br />• Passenger amenities: replace shelters at College Station <br />• Complete replacement of electric vehicle maintenance shop <br />EQUIPMENT • Replace nine paratransit vehicles with electric if feasible <br />• Replace three fixed route buses with electric <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.