Laserfiche WebLink
ZAP ENERGY <br />OPUS SEAWAY BLDG <br />SITE PLAN <br />SCALE: <br />im <br />• J& <br />WORK UNDER SEPARATE PERMITS: <br />MECHANICAL PERMIT <br />ELECTRICAL PERMIT <br />PLUMBING PERMIT <br />FIRE ALARM SYSTEM <br />FIRE SPRINKLER SYSTEM <br />• DOCUMENTS FOR WORK UNDER SEPARATE PERMITS OR DEFERRED SUBMITTALS SHALL BE <br />SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN CHARGE (ARCHITECT/ENGINEER <br />OF RECORD) FOR REVIEW PRIOR TO SUBMITTAL TO THE BUILDING OFFICIAL. <br />• NO WORK SHALL PROCEED UNTIL THE DOCUMENTS HAVE BEEN APPROVED BY THE <br />BUILDING OFFICIAL AND PERMIT OBTAINED. <br />DRAWING INDEX: <br />ee <br />Number <br />Sheet Title <br />-0.0 <br />COVER SHEET & SITE PLAN <br />-0.1 <br />GENERAL NOTES & SYMBOLS <br />1-0.2 <br />ACCESSIBIILTY DETAILS <br />I-CS-1 <br />1ST FL EXIT PLAN & CODES SUMMARY <br />I-CS-2 <br />2ND FL EXIT PLAN & CODES SUMMARY <br />1-1.1 <br />1ST FL DEMOLITION PLAN <br />1-1.2 <br />2ND FL DEMOLITION PLAN <br />1-2.1 <br />1ST FL DEMOLITION RCP <br />1-2.2 <br />2ND FL DEMOLITION RCP <br />-3.1 <br />1ST FLOOR PLAN <br />-3.2 <br />2ND FLOOR PLAN <br />1-4.1 <br />1ST FL BOB <br />I_4.2 <br />2ND FL RCP <br />I_5.1 <br />POWER, EQUIPMENT AND FURNTIURE PLAN <br />1-5.2 <br />POWER, EQUIPMENT AND FURNTIURE PLAN <br />1-6.1 <br />1ST FL FINISH PLAN <br />I1.2 <br />2ND FL FINISH PLAN <br />.1 <br />ENLARGED STAIR PLAN AND DETAILS <br />1-8.1 <br />ENLARGED RESTROOM PLANS <br />1-8.2 <br />INTERIOR ELEVATIONS <br />-9.1 <br />CONSTRUCTION DETAILS <br />-9.2 <br />CEILING DETAILS <br />-9.3 <br />CASEWORK DETAILS <br />-10.1 <br />DOOR SCHEDULE AND DETAILS <br />1-10.2 <br />DOOR DETAILS <br />S-3.0 <br />STRUCTURAL NOTES, DRAWING LIST, AND <br />SPECIAL INSPECTIONS <br />S-3.1 <br />LEVEL 1 PARTIAL PLAN <br />S-3.2 <br />LEVEL 2 PARTIAL PLAN <br />S-3.3 <br />STAIR PLAN & DETAILS <br />S-3.4 <br />OPERABLE PARTITION PLAN & DETAILS <br />S-3.5 <br />WALL OPENING DETAILS <br />CODE INFORMATION: <br />PROJECT ADDRESS: <br />APPLICABLE <br />EDITIONS OF BUILDING CODES: <br />OPUS SEAWAY <br />BUILDING <br />2018 INTERNATIONAL BUILDING CODE (IBC), <br />2300 MERRILL CREEK PKWY <br />EVERETT, WA <br />CODE <br />WAC 51-50 <br />EXISTING <br />2018 INTERNATIONAL EXISTING BUILDING CODE <br />BUILDING <br />(IEBC), <br />CONSTRUCTION TYPE: <br />CODE <br />301.3.2 WORK AREA COMPLIANCE METHOD <br />III-B <br />FIRE CODE <br />2018 INTERNATIONAL FIRE CODE (IFC), WAC <br />SPRINKLERED <br />51-54A, INCLUDING APPENDIX B & C <br />ZONE: <br />ENERGY CODE <br />2018 WASHINGTON STATE ENERGY CODE <br />L12 <br />(WSEC), WAC 51-11 <br />MECHANICAL <br />2018 INTERNATIONAL MECHANICAL CODE (IMC), <br />OCCUPANCY: <br />CODE <br />WAC 51-52 <br />B <br />ELECTRICAL <br />2020 NATIONAL ELECTRICAL CODE (NEC) (NFPA <br />TENANT SQUARE FOOTAGE: <br />CODE <br />70), 2020 WASHINGTON CITIES ELECTRICAL <br />(AREA OF WORK) <br />CODE WITH APPLICABLE ROW 19.28 & WAC <br />28,160 SF <br />296-46B <br />PLUMBING <br />2018 UNIFORM PLUMBING CODE (UPC), WAC <br />CODE <br />51-56 & 51-57 INCL. APPENDICES A, B, AND <br />I. <br />ZONING CODE <br />CITY OF EVERETT <br />ACCESSIBILITY <br />ICC/ANSI A117.1-2009 ACCESSIBLE AND <br />CODE <br />USABLE BUILDING AND FACILITIES <br />DESCRIPTION: <br />U <br />W <br />2 <br />U <br />Q <br />V <br />O <br />N <br />t% <br />LLI <br />Z <br />O <br />00 <br />N P <br />Q <br />L <br />ZAP ENERGY <br />Opus Seaway <br />Floor 1 & 2 <br />2300 Merrill Creek Pkwy <br />Everett, WA <br />DESIGN JPC <br />DRAWN NB/AG <br />CHECKED TIP <br />NO. 22-0799 <br />TAX PARCEL #: 280402-003-002-00 <br />SEC 02 TWP 28 RGE 04 LOT 5A OF SEAWAY CENTER FOUR ESP REC VOL 1 OF BSPS PG 246-247 AF <br />NO 9203025002 BEING PTN OF SW1/4 <br />VICINITY MAP: / <br />saes REGISTERED <br />n-ARCHITECT <br />MARK A. PET RSON <br />PROJECT LOCATION STATE OF WASHINGTON <br />2300 MERRILL CREEK PKWY <br />u� 02-17-2023 PERMIT SET <br />PROJECT TEAM: <br />TENANT: <br />ZAP ENERGY <br />3500 MERRILL CREEK PKWY <br />EVERETT, WA <br />235.283.9595 <br />JASON CLEMMER <br />JASON.CLEMMEROZAP.EN ERGY.COM <br />SAM CRUMLEY <br />SAM.CRUMLEY@ZAP.ENERGY <br />OWNER: <br />RAINER PROPERTIES, LCC <br />1118 2ND ST. <br />MUKILTEO, WA 98275 <br />JEFFERY LAVELLE <br />STRUCTURAL: <br />KPFF CONSULTING ENGINEERS <br />1118 2ND ST. <br />MUKILTEO, WA 98275 <br />206.622.5822 <br />CHRIS DAVIES <br />CHRIS. DAVIESOK PFF.COM <br />BRIAN HOOVER <br />BRIAN.HOOVER®KPFECOM <br />ARCHITECT: <br />JPC ARCHITECTS, LLC <br />909 112TH AVE HE <br />SUITE 206 <br />BELLEVUE, WA 98004 <br />(425) 641-9200 <br />TERESA PORTMAN- EXT. 370 <br />TERESAP®JPCARCHITECTS.COM <br />NICOLE BRITTENHAM - EXT. 393 <br />N ICOLEB@JPCARCHITECTS.COM <br />ANNA GRI FFITH- EXT. 311 <br />ANNAG®JPCARCHITECTS.COM <br />GENERAL CONTRACTOR: <br />TRICO COMPANIES <br />15066 JOSH WILSON ROAD <br />BURLINGTON, WA 98233 <br />(360) 757-2373 <br />JASON SOUP <br />JASON®TRICOCOM PANI ES.COM <br />COVER SHEET & <br />SITE PLAN <br />0.0 <br />2023. JPC ARCHITECTS. LLC <br />