My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2501 COLBY AVE 2023-10-20
>
Address Records
>
COLBY AVE
>
2501
>
2501 COLBY AVE 2023-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 3:38:12 PM
Creation date
8/30/2023 8:18:38 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2501
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Tuesday,June 14, 2022 1:42 PM <br /> To: tavysroofing@yahoo.com <br /> Subject: City of Everett Permit Services: 2501 Colby Avenue (B2205-067) - First Building Intake <br /> Review <br /> Hello, Gustavo. <br /> This email briefly recaps our telephone conversation. <br /> Your application has been received and a permit set up. However, the submitted documents are not <br /> sufficiently developed for us to perform a comprehensive review at this time. <br /> Information is attached to provide guidance. Construction-level documents should be submitted for <br /> review. Two complete sets of the revised drawings should be submitted to replace the previously submitted <br /> drawing sets. Preliminary comments are provided below to assist in preparing the drawings, but these are not <br /> intended to provide a comprehensive review. The resubmittal documents should include an itemized <br /> response letter clarifying how the review comments below have been addressed. Depending on your <br /> experience with the adopted codes and preparing documents, we recommend consulting with a design <br /> professional to assist you. <br /> Intake Review Comments: <br /> 1. The submitted drawings consist of only an aerial image of the building. Construction-level drawings <br /> should be submitted for review. At a minimum, the drawings should include a roof plan (drawn to- <br /> scale) and details for the proposed reroof construction. <br /> 2. It is understood that the existing roofing will be removed by others due to it likely containing asbestos <br /> materials. We do not have a separate application for this work. However, the scope of the removal of <br /> the existing roof and construction of the new roof should be combined into the same permit. Please <br /> coordinate with the owner and the contractor performing the abatement work to prepare a single <br /> application for the proposed reroofing project. <br /> 3. The project potentially involves increasing the weight of the roof structure. A structural analysis is <br /> required unless the roof construction including the new roofing materials complies with 2048 IEBC <br /> Section 706.2. Where the new weight exceeds 5% of the original design weight, structural analysis of <br /> the supporting framing in the load path (e.g.,joists, beam, posts, etc.) is required. <br /> 4. The description in the application includes the installation of plywood, which is understood to be <br /> placed over the roof board sheathing. Details for the construction, including but not limited to the <br /> sheet placement, orientation relative to supporting framing, and nailing, should be included. <br /> 5. Insulation of the roof to current levels for new construction is required if part or all of the insulation is <br /> provided above the structural roof deck. Verify the location of the insulation. Note that if the existing <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.