Laserfiche WebLink
• • <br /> roof sheathing is removed and the roof cavity exposed, insulation to current levels is similarly <br /> required. See the 2018 WSEC Chapter 5. <br /> 6. The project requires submission of the RCW64.55 form. Note that an architect may be required <br /> depending on the option selected. See the following link: <br /> https://www.everettwa.gov/DocumentCenter/View/109/RCW-6455-checklist-PDF <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> — Drew Martin, P.E., S.E. <br /> NEAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:00pm-3:0Opm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 2 I <br />