My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2939 COLBY AVE EVERETT MUSEUM 2023-09-26
>
Address Records
>
COLBY AVE
>
2939
>
EVERETT MUSEUM
>
2939 COLBY AVE EVERETT MUSEUM 2023-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 9:09:57 AM
Creation date
8/30/2023 9:42:34 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2939
Tenant Name
EVERETT MUSEUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Arrircsaa <br /> =-- azan&Associates, lnc. Field <br /> Geotechnical Engineering• Environmental Engineering Report NO.:09618523DFR11212018JD-1 <br /> Construction Testing and Inspection <br /> DATE: 11/21/2018 Set Count: 1 CONTRACTOR: Newland Construction <br /> PROJECT#: 09618523 PERMIT#: B1807-010 <br /> PROJECT: Everett Museum of History INSPECTOR: Jeff Dewey <br /> LOCATION: 2939 Colby Ave.Everett,WA JURISDICTION: City of Everett <br /> KA P.M.: Jeff Mercer WEATHER: Cloudy,Light Rain TEMP:45 <br /> A representative of Krazan and Associates arrived on-site as scheduled to perform construction observation.While on-site, <br /> we observed the placement of reinforcing steel by Newland Construction for the elevator pit footings.The reinforcing <br /> placement was observed for size,grade,ties,splices,spacing,concrete coverage,cleanliness,and general overall <br /> placement.The reinforcing steel was placed in general compliance with the project plans,specifications,and governing <br /> documents with the exception of the following items: <br /> 1.Various areas did not have the specified minimum concrete coverage between the reinforcing steel and the ground.These <br /> areas were corrected by excavating additional soil in the areas of contact. <br /> 2.There were(3)bars specified to run each direction in the sump pit and reinforcing steel in place had only(2)bars <br /> running in each direction.Additional reinforcing steel was added per the project plans and specifications. <br /> Richard,foreman with Newland,was notified of all observations. <br /> � _ r�.'_-.ter - _ - pd• <br /> f • <br /> • <br /> : 'F le 'us <br /> € <br /> t <br /> - I 1- 1 -` <br /> irk=zsit „„„ itt <br /> er <br /> • <br /> Reinforcing Steel Placed by Newland for the Elevator Pit Foundation <br /> Offices Serving the Western United States <br /> Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 •Tacoma(253) 939-2500 <br /> The information provided on this report is prepared for the occlusive use of the client.This report may not be reproduced in any format without the written permission of the client and Krazan&Associates.This report <br /> indicates our inspectors observation and testing results based on site conditions and contractor activities.This information is subject to review prior to final submittal.By signing this report,our inspector does not accept <br /> responsibility for validity of results.The same information has been provided by others on site. <br /> `4 /5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.