My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 BROADWAY CM HEATING 2023-09-25
>
Address Records
>
BROADWAY
>
1415
>
CM HEATING
>
1415 BROADWAY CM HEATING 2023-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2023 11:55:31 AM
Creation date
9/7/2023 8:52:39 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1415
Tenant Name
CM HEATING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r <br /> MR#6 RUNOFF TREATMENT: <br /> The project is exempt from water quality as the project discharges to the combined sewer <br /> system. A floatable materials separator and gas trap is proposed for the project. <br /> MR#7 FLOW CONTROL: <br /> Flow control requirements will be met by a 15 LF 6-foot diameter detention pipe on the <br /> east side of the building. The existing basin was modeled as existing conditions per section <br /> 4-4.4 of the City Design and Construction Standards and Specifications. <br /> MR#8 WETLANDS PROTECTION: <br /> There are no wetlands located within the site. <br /> MR#9 OPERATIONS AND MAINTENANCE: <br /> Please refer to Appendix G for the Operation and Maintenance Manual. <br /> Insight Engineering Co. -Stormwater Site Plan 3/25/2021 <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.