Laserfiche WebLink
r r <br /> MR#6 RUNOFF TREATMENT: <br /> The project is exempt from water quality as the project discharges to the combined sewer <br /> system. A floatable materials separator and gas trap is proposed for the project. <br /> MR#7 FLOW CONTROL: <br /> Flow control requirements will be met by a 15 LF 6-foot diameter detention pipe on the <br /> east side of the building. The existing basin was modeled as existing conditions per section <br /> 4-4.4 of the City Design and Construction Standards and Specifications. <br /> MR#8 WETLANDS PROTECTION: <br /> There are no wetlands located within the site. <br /> MR#9 OPERATIONS AND MAINTENANCE: <br /> Please refer to Appendix G for the Operation and Maintenance Manual. <br /> Insight Engineering Co. -Stormwater Site Plan 3/25/2021 <br /> -7- <br />