My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 BROADWAY CM HEATING 2023-09-25
>
Address Records
>
BROADWAY
>
1415
>
CM HEATING
>
1415 BROADWAY CM HEATING 2023-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2023 11:55:31 AM
Creation date
9/7/2023 8:52:39 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1415
Tenant Name
CM HEATING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION II: SITE ASSESSMENT <br /> Based on the site reconnaissance and the available topography we have the following info: <br /> • Topography: The topography of the site shows a 2 to 4-ft fall to the west.Refer to the <br /> grading plan for more details. <br /> • Drainage: The majority of the site drains to the existing combined storm and sanitary <br /> sewer system in the alley to the east between Broadway and Mcdougall Ave. <br /> • Soils: Per SCC survey of Snohomish County,the project site contains Alderwood <br /> Urban Land Complex 2 to 8 percent. Refer to the attached soil map later in this report. <br /> • Ground Cover: The northern parcel exists as a residential property with an existing <br /> home, the center parcel exists as parking lot, and the southern parcel exists as a <br /> commercial property with an existing commercial building. <br /> • Critical areas: There are no critical areas located within the site. <br /> • The access to the site will be from the alley between Broadway and Mcdougall Ave. <br /> Insight Engineering Co. -Stormwater Site Plan 3/25/2021 <br /> - 8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.