Laserfiche WebLink
S i • • <br /> CITY OF EVERETT <br /> EVERETT Public Works Department <br /> WASHINGTON <br /> Date:April 27,2022 <br /> Owner: Nada Elia <br /> Job Address: 1710 Maple St. Everett,WA 98201 <br /> Plan Check No: B2204-023 <br /> Email Address: nadaelia@yahoo.com <br /> RE: Building Submission Intake Letter <br /> Dear Nada, <br /> In response to the application for a building permit,the plans have been examined and you are advised <br /> that revisions are required before a review may begin. Please review and respond to the comments <br /> below. <br /> 1. The proposed project includes structural work. Structural drawings should be submitted that <br /> include framing plans for the floor, roof, and ceiling. The drawings should substantiate <br /> compliance with the prescriptive requirements of the IRC and drawings should show a complete <br /> load path. See IRC Sections R106.1.1 and R301.1. Alternatively,an engineered analysis and design <br /> may be performed per IRC Section R301.1.3; sealed and signed drawings and calculations <br /> prepared by a professional engineer licensed in the state of Washington are required per RCW <br /> 18.43.010, 18.43.020,and 18.43.070. See IRC Section R301.1. <br /> In order for the processing of your application to continue, it will be necessary to provide the Building <br /> Division with two new sets of revised construction documents reflecting the corrections requested. <br /> Please include a response letter which indicates how the corrections were resolved. <br /> These initial comments are general in nature and based on preliminary information.Additional <br /> comments will typically be generated once a complete submission is reviewed. All comments are based <br /> on the 2018 International Building Code(IBC), 2018 International Residential Code(IRC),and/or the <br /> 2018 Washington State Residential Energy Code(WSEC),as amended by the State of Washington and <br /> adopted by the City of Everett. <br /> These comments address building issues only.Additional revisions or additions may be required by other <br /> departments(such as Utilities,Traffic,Planning or Fire). All required submittals must be of sufficient detail <br /> and information to ensure that the proposed structure will be constructed in compliance with all adopted <br /> codes. <br /> Sincerely, <br /> Rakeeb Khan <br /> Development Technician <br /> I� <br /> 3200 Cedar Street 425.257.8810 0 PermitServices@everettwa.gov <br /> 0V Everett,WA 98201 everettwa.gov/permits <br />