My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W ZAP ENERGY 2023-10-23
>
Address Records
>
23RD DR W
>
5901
>
ZAP ENERGY
>
5901 23RD DR W ZAP ENERGY 2023-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 9:42:57 AM
Creation date
9/8/2023 12:05:46 PM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c ' ve <br /> 11/18/22,9:57 AM https://waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3B0PXNjY19mdWxseV9jb25kaXRpb251ZCU3Q3BkX2NoZ19zcGFjZV9jb25kaXRpb25pbmcmdGZ... <br /> ENVELOPE COh ' IANCE SUMMARY =. `- <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Admi 1. -ed by:©2022 NEEA,All rights reserved <br /> Project Title ZAP Energy Tenant Improvement-2018 WSEC For Building Departgtp}�,[Is 2 <br /> 2022 I Date: NOV 18,2022 <br /> Project Address 5901 23rd Dr W NNUU VV3 / <br /> Project&Applicant Everett,WA 98203 —J , <br /> Information Applicant Name <br /> Applicant Phone CITY OF EVERETT <br /> Applicant Email Permit Services <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Manufacturing/Factory Building Cond.Floor 616 <br /> Area <br /> Project Cond.Floor Area 616 ProjectScope Change in Space Conditioning(Low energy converted to Fully Space Conditioning — <br /> FullyConditioned Floors Above Grade 1 <br /> 1 Conditioned) Categories <br /> Compliance Method Compliance Method 1-General <br /> 411kvelope Project Description 616 SF tenant improvement in existing warehouse space.Change in space conditioning from low energy to fully conditioned space.Metal frame walls and ceiling lid over existing slab on grade. <br /> The space does not contain any exterior slab edge condition. <br /> • <br /> Envelope Scope Space Conditioning Category Compliance Method WWR/SRR UA Calculation Adjustment Fenestration Alternates Compliance Verification <br /> Compliance per Category <br /> Scope and ChangeSpace 0% 0% Change of space conditioning allowance <br /> Method in Conditioning Fully Conditioned Component performance / (UA 10%higher than WSEC target) <br /> 1 No alternates selected COMPLIES <br /> • <br /> Air Barrier Testing Air barrier testing included in project scope Air Barrier Comments <br /> Project Title ZAP Energy Tenant Improvement-2018 WSEC bate Nov 18,2022. <br /> Scope&Space Conditioning a"GE IN SPACE CONDITIONING-FULLY CONDITIONED ,.>,..,S ' ompliance Verification COMPLIES <br /> Window-to-wall Ratio 0% (Skylight-to-roof-ratio I 0% Vertical Fenestration Alternate No alternates selected <br /> Opaque Envelope Assemblies <br /> Insulation R-Values _ <br /> Roof/Ceiling Location in Documents Assembly ID Assembly Location Cavity °Continuous 2nd Layer U-Factor Net Area(SF) <br /> (/o penetration) (MB Root) <br /> III Joist or single rafter A2.2 Metal joist with cavity+rigid insulation Interior partition R-38 R-25(<0.04%) U-0.025 616 <br /> U-Factor Source:Computed U-Factor Source Description:See attached U-factor calculation <br /> Roof Framing Type(Standard,Advanced):Standard Roof Framing Material:Steel-framed <br /> Ceiling/Attic Venting:Unvented Is this assembly exterior or interior?:Interior partition <br /> Is assembly new,upgraded or unaltered existing?:New assembly <br /> • <br /> Continuous Insulated Wall <br /> Walls Location in Documents Assembly ID I Assembly Location Cavity U-Factor Net Area(SF) <br /> (%penetration) Furring <br /> Steel-framed-Commercial A2.2 Metal frame walls Type A Interior partition R-13 R-10(<0.04%) U-0.055 288 <br /> U-Factor Source:WSEC Appendix A U-Factor Source Description:Default Table A103.3.6.1(1) <br /> Framing Depth:2x4 Framing Spacing:24 <br /> — <br /> Is this assembly exterior or interior?:Interior partition Is assembly new,upgraded or unaltered existing?:New assembly <br /> Fenestration&Opaque Door Assemblies <br /> Insulation R-Values <br /> Opaque Doors Location in Documents Assembly ID Assembly Location Door Insulation U-Factor Rough <br /> Opening(SF) <br /> Swinging A2.2 Double Doors to warehouse Interior partition U-0.37 42 <br /> What percentage of this opaque door is glazing?:50%or less U-Factor Source:WSEC Appendix A <br /> U-Factor Source Description:default for hollow metal insulated core doors Is this assembly exterior or interior?:Interior partition <br /> Is assembly new,upgraded or unaltered existing?:New assembly <br /> https://waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3BOPXNjY19mdWxseV9jb25kaXRpb251ZCU3Q3BkX2NoZ19zeGFjZV9jb25kaXRpb25pbmcmdGZ2PXNjY19mdWxseV... '113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.