My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1427 100TH ST SW CLUBHOUSE 2023-09-08
>
Address Records
>
100TH ST SW
>
1427
>
1427 100TH ST SW CLUBHOUSE 2023-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2023 1:55:34 PM
Creation date
9/8/2023 1:11:02 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1427
Unit
CLUBHOUSE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 1/6/2022 <br />City of Everett Permit Services Public Works Permit N: PW2201-003 <br />320G Cedar Street, 2"a Floor Associated Bldg Permit lt: R: <br />E V E R E T T Everett, WA 98201 Planning Reference N: <br />WASH I NOTON everettwa.eov/permits Public Works Fee: $799.14 <br />Perm it5ervicesg eve rettwa.eov Schedule mspeRions at; onlinepermits.evereffoxi <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />CPI FAIRWAY ESTATES OWNER LLC LAW RENCE HOUSTON <br />1001 PENNSYLVANIA AVE NW <br />WASHIN(bi DC 20004 <br />PHONE: PHONE: 2068191279 <br />SITE ADDRESS: 1427 100TH ST SW CLUBHOUSE TAX PARCEL me: 28041400400800 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: REPLACE EMG CONCRETE PAD W/ NEW <br />NOTES: REPLACE EXTG CONCRETE PAD W/ NEW <br />PERMRCONDITIONS: <br />1. All Inspections shall be scheduled online at htum I/onlinewarmits.unimproved . Available Inspection dates are shown In the dropdown menu. <br />2. All work shall be performed in aaordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br />Development. <br />3. Oil Location Underground Service 48 hours before you dig. The day you call does nor count TDLL FREE NUMBER 811. <br />4. Site C'wil Work to be done per plans approved by the Cry of Everett Public Works Department Approved plans must remain on jobsite at all <br />times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at on mace rats.everettwa.gov to formally request <br />all required inspections. A handout is provided at Permit issuance with instructions on how to request an inspection online. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SW PPP/TESC Plan. Remove upon completion of the protect prior to final approval of the Permit. <br />T. Keep Cry streets clean at all times. No dirt, mud,rocks, or debris to M tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City Improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. It is the applicam/owner's responsibility to ensure that stormwater runoff from new/replaced Impervious surfaces will be managed on site in a <br />manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the improvements located <br />therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained from the <br />City's Traffic Engineering Division. This permit Dun be applied for online at onlinepermits.everetiwa.g s, and requires a traffic control plan to be <br />submitted for the area of requested closure. Please allow 1-2 weeks For ISO permit Issuance ham the date of application. <br />12. This permit must be finaled in order to close out this permit/grant a Certificate of Daupanry. Request a final inspection online by selecting PW <br />25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items haw been complete <br />Public Works Permit Fee Breakdown: <br />Erosion Control............................ .......................... $50.W <br />Paving R48WFl....................................................$45.W <br />PW Plan Review...................................................$20.W <br />PW Site Inspection ...............................................$20.W <br />Stormwater System Development Fee........ ....... $664.14 <br />ACBNOWIEDGEMENT OF CONDITIONS <br />By Purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City W Everett from any and all <br />claims for damages, costs, expenses, or causes of action that may arise because of Installation and maintenance of the improvement or other right- <br />of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br />VAUDMIUPIMDON: <br />Work authorized by this Permit must be started within 180 days of date permit Is Issued and thereafter Is to be diligently pursued to completion. This <br />Permit may be canceled by the city upon any stoppage W work on this Project over Dal duration. Each inspection extends the expiration date <br />180 days to keep the permit open while work is active. <br />Page 1 of 1 <br />_APPLICANT/I03 SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.