Laserfiche WebLink
Fairway Estates -Clubhouse <br />1427 100th St. SW, Everett, WA <br />LANDSCAPE PLANS - DD SET <br />GENERAL NOTES: <br />I. THESE CONSTRUCTION DOCUMENTS, INCLUDING ALL PLANS, NOTES, DETAILS AND SPECIFICATIONS ARE <br />INTENDED TO FACILITATE THE INSTALLA➢ON CONTRACTOR BY PROVIDING GENERAL GUIDELINES FOR <br />DESIGN INTENT. IT IS THE GOAL OF THE DOCUMENTS THAT THE WORK IS TO BE COMPLETED WITHOUT <br />CHANGE ORDERS. ALL QUANTITIES SHOWN IN THE DOCUMENTS ARE ESTIMATES ONLY AND ARE NOT <br />GUARAMEED: THE CONTRACTOR SHALL SUPPLY ALL MATERIALS, LABOR AND EQUIPMEM IN ORDER TO <br />FULFILL THE INTENT OF THE DESIGN DRAWINGS. <br />2. INTERPRETATION OF THE PLANS AND SPECIFICATIONS SHALL BE MADE BY THE "AUTHOR" OR <br />"ARCHITECT/ENGINEER-OF-RECORD' OF THE RESPECTIVE DOCUMENT AND SHALL BE CONSIDERED FINAL. <br />ANY POSSIBLE AMBIGUITY SHALL BE SUBMITTED IN WRITING BY THE CONTRACTOR PRIOR TO SUBMITTING <br />FORMAL BIDS, ALL CLARIFICATIONS SHALL BE PREPARED IN WRITING BY THE <br />"ARCHITECT/ENGINEER-OF-RECORD" PRIOR TO BIDDING. ME CONTRACTOR SHALL ACCEPT THE <br />INTERPRETATION OF THE "ARCHITECT/ENGINEER-0E-RECORD' AS THE CORRECT AND FINAL <br />INTERPRETATION. <br />3. ANY INCIDENTAL INSTALLATION PROCEDURE, MATERIAL OR EQUIPMENT, NOT MENTIONED IN THESE <br />CONSTRUCTION DOCUMENTS, THE SPECIFICATIONS NOR SHOWN ON THE PLANS, WHICH MAY BE <br />NECESSARY FOR COMPLETION AND SATISFACTORY OPERATION OF THE DESIGN SYSTEM SHALL BE <br />FURNISHED AND INSTALLED (AS BASED ON INDUSTRY STANDARDS( AS THOUGH SHOWN OR PROVIDED <br />FOR. <br />4. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE LOCATIONS OF EXISTING AND FUTURE <br />UNDERGROUND SERVICES AND IMPROVEMENTS WHICH MAY CONFLICT WITH THE WORK TO BE DONE. <br />NOTIFY THE OWNER'S AUTHORIZED REPRESENTATIVE IMMEDIATELY SHOULD A CONFLICT ARISE. <br />5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS AND SHALL NOTIFY ALL <br />UTILITY COMPANIES WITH UTILITIES ON SITE PRIOR TO ME CONSTRUCTION OF ME PROJECT. <br />6. FOR UNDERGROUND UTILITY COORDINATION AND 48 HOURS PRIOR TO START OF CONSTRUCTION <br />(DEPENDING ON AREA OR JURISDICTION(, ME CONTRACTOR SHALL CONTACT: <br />A( UTILITY NOTIFICATION CENTER (WASHINGTON) 1-800-424-5555 <br />B( UNDERGROUND SERVICES ALERT (USA) 1-800-227-2" <br />C( SEATTLE PUBLIC UTILITIES 1-206-684-3000 <br />7. THESE NOTES ARE TO BE USED FOR GENERAL REFERENCE IN CONJUNCTION WITH AND AS A SUPPLEMENT <br />TO THE WRITTEN SPECIFICATIONS, APPROVED ADDENDUMS, AND THE CHANGE ORDERS AS ASSOCIATED <br />WITH THESE CONSTRUCTION DOCUMENTS. <br />8. SHOULD THE CONTRACTOR HAVE ANY QUESTIONS REGARDING THESE CONSTRUCTION DOCUMENTS OR <br />SHOULD THERE BE ANY DISCREPANCIES, HE SHALL CONTACT THE LANDSCAPE ARCHITECT FOR <br />CLARIFICATION BEFORE PROCEEDING FURTHER. <br />9. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS AND PER GOVERNING CODES AND/OR <br />ORDINANCES. <br />10. THE CONTRACTOR SHALL PROVIDE BARRICADES AND TRAFFIC CONTROL ALONG PUBLIC STREETS, IF <br />REQUIRED, DURING INSTALLATION. <br />11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REPORT TO THE LANDSCAPE ARCHITECT AND/OR THE OWNER'S <br />AUTHORIZED REPRESENTATIVE ANY DISCREPANCIES BETWEEN THE CONSTRUCION DOCUMENTS AND FIELD <br />CONDITIONS PRIOR TO ME START OF WORK. <br />12. BEFORE WORK BEGINS ON THE PROJECT, THE CONTRACTOR SHALL REVIEW THE PROJECT WITH THE <br />LANDSCAPE ARCHITECT AND/OR THE OWNER'S AUTHORIZED REPRESENTATIVE, <br />13. THE LANDSCAPE ARCHITECT AND/OR THE OWNER'S AUTHORIZED REPRESENTATIVE SHALL APPROVE ANY <br />OR ALL CHANGES PRIOR TO THE START OF WORK. <br />14. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND COORDINATING EXISTING SITE CONDITIONS. <br />15. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE LOCAL, STATE, AND/OR FEDERAL LAWS AND/OR <br />REGULATIONS PERTAINING TO THE PROJECT. <br />16. THE CONTRACTOR SHALL PROPERLY COORDINATE HIS WORK WITH OTHER CONTRACTOR'S WORK PRIOR <br />TO INSTALLATION. <br />17. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT EXISTING IMPROVEMENTS AND <br />THE PUBLIC FROM DAMAGE THROUGHOUT CONSTRUCTION. <br />18. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGES IMPOSED, UNINTENTIONALLY <br />OR ACCIDENTALLY TO EXISTING UTILITIES. STRUCTURES, WALLS, OR OTHER AMENITIES, DUE TO THE ACTION <br />OF THE CONTRACTOR,CONTRACTOR'S EMPLOYEES AND/OR THE CONTRACTOR'S SUBCONTRACTORS. <br />DAMAGE OCCURRED DURING THE CONTRACTOR'S OPERATION SHALL BE REPAIRED, AT THE EXPENSE OF <br />THE CONTRACTOR, TO THE SATISFACTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. <br />19. MATCH GRADES, LAYOUT AND ELEVATIONS OF ADJOINING LANDSCAPE WORK BY OTHERS. NOTIFY THE <br />LANDSCAPE ARCHITECT OF CONFLICTS BEFORE PROCEEDING WITH CONSTRUCTION. <br />PLANTING GENERAL NOTES: <br />I. THE CONTRACTOR SHALL REVIEW PLANTING PLAN WITH LANDSCAPE ARCHITECT PRIOR TO INSTALLATION, <br />2. THE LANDSCAPE ARCHITECT OR HIS REPRESENTATIVE RESERVES THE RIGHT TO REFUSE ANY PLANT <br />MATERIALS HE DEEMS UNACCEPTABLE. SEE SPECIFICATIONS. <br />3. THE CONTRACTOR SHALL SUPPLY AND INSTALL ALL PLANT MATERIAL AS SPECIFIED ON THE PLANTING <br />PLANS. HOWEVER. SHOULD THE PLANT MATERIAL BE TEMPORARILY UNAVAILABLE, THE CONTRACTOR <br />SHALL NOTIFY ME LANDSCAPE ARCHITECT AND INSTALL 5 GALLON NURSERY BUCKETS WITH IRRIGATION AT <br />EACH PLANT LOCATION. AS THE PLANT MATERIAL BECOMES AVAILABLE, THE 5 GALLON BUCKETS SHALL BE <br />REMOVED AND PLANT MATERIAL INSTALLED. <br />4. ANY AND ALL SUBSTITUTIONS TO BE APPROVED BY DESIGN/BUILDER AND/OR THE LANDSCAPE ARCHITECT. <br />5. LOCATE PLANES AWAY FROM SPRINKLER HEADS, LIGHT FIXTURES AND OTHER OBSTRUCTIONS. <br />6. FINAL LOCATION OF ALL PLANT MATERIAL SHALL BE SUBJECT TO THE APPROVAL OF THE OWNER'S <br />AUTHORIZED REPRESENTATIVE. <br />7. PLANTING AND IRRIGATION DESIGN MAY BE MODIFIED TO ADAPT TO WALK CONFIGURATIONS THAT <br />DIFFER FROM THESE PLANS, OR BECAUSE OF GRADE LIMITATIONS ON SITE. <br />8. WATER TEST ALL TREE PLANTING HOLES PRIOR TO PLANTING. IF TREE HOLE DOES NOT DRAIN, DO NOT <br />PLANT, SEE HARDPAN DETAIL. <br />9. REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS NOT SHOWN ON DRAWINGS. <br />10. TREES SHALL BE PLANTED A MINIMUM OF 194" FROM STREET LIGHTS / FIRE HYDRANTS, 6'41 FROM EDGE OF <br />UNDERGROUND PIPELINES AND A MINIMUM OF 4'-OrFROM WALKS, CURBS AND WALLS. SHRUBS SHALL BE <br />PLANTED A MINIMUM OF 2'-0' FROM CURB AND WALKS. <br />IL ALL SPECIMEN TREES, SHRUBS AND CACTI SHALL BE FIELD LOCATED BY LANDSCAPE ARCHITECT OR <br />OWNER'S AUTHORIZED REPRESEMAEIVE. <br />12. THE CONTRACTOR SHALL INSTALL"SHAWTOWN ROOT BARRIER PANELS' (OR APPROVED EQUAL) AT ALL <br />TREES WITHIN 7'-LY' FEET OF HARDSCAPE ELEMENTS INCLUDING (BUT NOT LIMITED TO( SIDEWALKS, ASPHALT, <br />CONCRETE SLABS / FOOTINGS AND STRUCTURES. CONTRACTOR SHALL SUBMIT SPECIFICATION SHEETS OF <br />PROPOSED ROOT BARRIER PANELS TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO <br />INSTALLATION. <br />13. THE CONTRACTOR SHALL INSTALL ARBOR GUARDS AT ALL TREES LOCATED IN TURF AREAS. <br />14. ON -SITE AND OFF -SITE TOPSOIL SHALL CONFORM TO CONTENT REQUIREMENTS AS SPECIFIED IN PART 2OF <br />THE PLANTING SPECIFICATIONS. AGRONOMY TEST SUBMITTALS ARE REQUIRED FOR ALL MATERIAL USED <br />FOR TOPSOIL AND BACKFILL. SUBMIT REPORT TO LANDSCAPE ARCHITECT FOR REVIEW. <br />15. ALL PLANT MATERIAL SHALL BE IN COMPLIANCE WITH THE AMERICAN STANDARDS FOR NURSERY STOCK, <br />LATEST EDITION. <br />I& THE CONTRACTOR SHALL PROVIDE MAINTENANCE FOR ALL ALL PLANT MATERIAL FROM THE TIME OF <br />INSTALLATION THROUGH SUBSTANTIAL COMPLETION. <br />17. CACTI SHALL BE PLANTED A MINIMUM OF 3'1 FROM ALL PEDESTRIAN ROUTES. <br />18. CACTI SHALL BE WELL ROOTED AND NON -SCARRED. <br />M PLANT MATERIAL MARKED'SALVAGE'SHALL BE SELECTED FROM ON- SITE SALVAGE INVENTORY. ALL <br />MATERIAL SELECTIONS SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND/OR OWNER'S AUTHORIZED <br />REPRESENTATIVE. <br />20. IN DISTURBED AREAS INDICATED TO RECEIVE REVEGETATION HYDROSEED AND/OR PLANTING, THE <br />CONTRACTOR SHALL MATCH EXISTING NATURAL DESERT STONE GROUND COVER CONDITIONS ADJACENT <br />TO THE PROJECT. <br />21, NAIVE REVEGETATION AREAS AND PLANTER BEDS SHALL BE TREATED WITH PRE -EMERGENT AS PER <br />MANUFACTURER'S INSTRUCTIONS. REAPPLYAS NECESSARY TO ELIMINATE INVASIVE WEEDS. REMOVE ALL <br />DEAD DEBRIS. <br />22. THE CONTRACTOR SHALL PROVIDE A 50'4'BYW-0'TYPICAL MOCK-UP OF NATIVE REVEGETATION AREAS <br />FOR REVIEW BY THE LANDSCAPE ARCHITECT OR OWNER'S AUTHORIZED REPRESENTATIVE. <br />23. ALL TREE STAKING SHALL CONFORM TO THE PLANTING DETAILS OR AS NOTED IN TH E SPECIFICATIONS. THE <br />LANDSCAPE ARCHITECT OR OWNER'S AUTHORIZED REPRESENTATIVE SHALL REVIEW TYPICAL TREE STAKING <br />PRIOR TO FINAL ACCEPTANCE. <br />INERT GENERAL NOTES: <br />ANGULAR GRANITE RIPRAP <br />1. INSTALL GRANITE RIP -RAP IN ALL DRAINAGE SWALES, AND WHERE INDICATED ON PLANS (TYPICAL(. REFER <br />TO MATERIALS SCHEDULE / PIANTING LEGEND FOR COLOR AND SIZE OF GRANITE RIP RAP. <br />2. THE CONTRACTOR SHALL SUBMIT SAMPLES TO LANDSCAPE ARCHITECT MR REVIEW AND APPROVAL <br />PRIOR TO INSTALLATION. <br />DECOMPOSED GRANITE <br />1. DECOMPOSED GRANITE IS REQUIRED IN ALL PLANTING AREAS, EXCEPT AREAS OF TURF AND GRANITE <br />RIP -RAP, AND SHALL EXTEND UNDER PLANT MATERIAL UNLESS NOTED OTHERWISE ON PLANS. REFER TO <br />MATERIALS SCHEDULE / PLANTING LEGEND, <br />2. ALL PLANTING AREAS SHALL RECEIVE A T' MINIMUM LAYER OF DECOMPOSED GRANITE, THROUGHOUT <br />(TYPICAL(. <br />3. CONTRACTOR SHALL SUBMIT SAMPLES TO LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR <br />TO INSTALLATION. <br />IRRIGATION GENERAL NOTES: <br />1. THE LANDSCAPE CONTRACTOR 6 RESPONSIBLE FOR FULL IRRIGATION COVERAGE OF ALL <br />PLANT MATERIAL. <br />2. THE LANDSCAPE CONTRACTOR SHALL SUBMIT FULL PIPING PLANS, AFTER FIELD <br />VERIFICATION, DEPICTING POINT OF CONNECTION, METER LOCATION AND SIZE, <br />BACKFLOW PREVENTER LOCATION AND SIZE, AND PIPE ROUTING AND SIZES, <br />3. THE LANDSCAPE CONTRACTOR SHALL INSTALL THE SPECIFIED SYSTEM IN ACCORDANCE <br />WITH THE ATTACHED SCHEDULES, NOTES, DETAILS, AND SPECIFICATIONS. <br />4. THE LANDSCAPE CONTRACTOR TO SITE VERIFY PRESSURE AND NOTIFY LANDSCAPE <br />ARCHITECT OF ANY DIFFERENCES PRIOR TO INSTALLATION OR ORDERING OF MATERIALS. <br />IF CONTRACTOR FAILS TO NOTIFY LANDSCAPE ARCHITECT, HE IS FINANCIALLY <br />RESPONSIBLE FOR ANY NECESSARY SYSTEM ALTERATIONS THAT RESULT. <br />5. THE LANDSCAPE CONTRACTOR SHALL FIELD VERIFY EXISTING TAP LOCATIONS. INSTAL - <br />NEW METERS PER THE ATTACHED IRRIGATION SCHEDULE. <br />6. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND PATCHING OF <br />ASPHALT AND CONCRETE AS REQUIRED FOR SLEEVE INSTALLATION ACCORDING TO THE <br />IRRIGATION SCHEDULE. <br />7. CONTROLLER TO BE INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS. CONTROLLER <br />SIZE AND QUANTITIES TO BE DETERMINED BY THE VALVE REQUIREMENTS AND POINTS OF <br />CONNECTION. INSTALL ONE (1) CONTROLLER AT EACH POINT OF CONNECTION. <br />8. INSTALL PVC MAINLINE AND LATERALS ACCORDING TO THE IRRIGATION AND PIPING <br />SCHEDULES. <br />9. ALL VALVE FLOWS SHALL NOT EXCEED MANUFACTURER'S SPECIFICATINS. <br />10, VALVE BOXES SHALL BE SQUARE TO ADJACENT WALKS OR CURBSANDOFLUSH WITH THE <br />FINAL GRADE. <br />11. WORK SHALL CONFORM TO ALL CONSTRUCTION CODES AND REGULATIONS. <br />12. THE LANDSCAPE CONTRACTOR SHALL INSTALL GREEN VALVE BOXES IN TURF AREAS AND <br />TAN VALVE BOXES IN DECOMPOSED GRANITE AREAS R YPICAL. <br />13. REFER TO THE NOTE #IGARON NOTES FF R S FROMTHATNCALCULATED PRESSURE AT THE WATER METER. <br />REFER LANDSCAPE NOTE CO PRESSURE DIFFERS FROM THAT NOTED. <br />14, THE STALLAION CONDITIONS. <br />15. VISIT SITE PRIOR TO BIDDING ON PROJECT TO <br />VERIFY INSTALLATION CONDITIONS. <br />15. PRIOR TO COMMENCEMENT OFANY <br />DEPTHS OFTHE UNDERGROUND <br />UHALL CONTACT BLUE <br />STAKEED VERIFY LOCATIONS AND <br />SHALL BE <br />R D UTILITIES THAT MAY BE <br />EFFECTED BY HIS WORK, AND O SHALL BE RESPONSIBLE FOR DAMAGES i0 SUCH <br />UTILITIES CAUSED ASARESULT <br />ES HIS IRRIGATION INSTALLATION. <br />16. THE SHALL EEFOR ANY <br />FOR COMPENSATING THE OWNER AND/OR <br />THEOWNER'SREPRESENTATIVEFORANY DESIGN CHANGES MADE TI ARESULT <br />UE <br />DEVIATION BY THE CONTRACTOR <br />FA FROM THE PLANS AND SPECIFICATIONS OR DUE i0 <br />ERRORS, FAULTY MATERIAL OR FAULTY WORKMANSHIP. <br />1, INSTALL ALL MAINLINES WITH AMINIMUM OF2(1"OFCOVER. <br />189. INSTALL ALL LATERALS WITH A MINIMUM OF 1 T' OF COVER. <br />19. ALL PIPE TO BE INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS AND ASTM <br />STANDARD D 2774. <br />20. ALL BY <br />MADED NUFACTNESTOBE COATEDTEFLO TONM TAPE <br />LP UNLESSOTHERWISE <br />ONLY. <br />SPECIFIED <br />BY THE MANUFACTURER. ALL LINE PRIORLIQUID TALON ON METAL SPRINIPE KLERS <br />AND <br />ONLY. <br />21. FLUSHING OF ALL LINES PRIOR TO INSTALLARON OF SPRINKLERS AND EMITTERS IS <br />REQUIRED. <br />22. INSTALL ALL SPRINKLERS, S. AND RECITED MATERIAL PER IRRIGATION SYSTEM <br />SPECIFICATIONS AND DETAILS. <br />23. INSTALL ALL ELECTRICAL JOINTS WITH SHALL BE WATERPROOF CONNECTORS. <br />24. BO ES, CONTR CONNECLONS URESN VALVE BAT OXES <br />SPECIFICALLY <br />CONTROL VALVE <br />BOXES, CONTROLLER ENCLOSURES AND VALVE BOXES SPECIFICALLY FOR ELECTRICAL <br />CONNECTIONS. <br />25. ARCUIT IED BREAKER RICIAN AT <br />LT RESPONSIBLE FOR INSTALLING ALL WIRING <br />CONTR CONTROLLER, <br />M THE <br />CIRCUIT BREAKER AT THE 12(1 VOLT SOURCE LOCATION TO AUTOMATIC CONTROLLER. <br />27. ALL LL VOLT <br />VALVE WIRINOWERG <br />WIRE TOBE INE NSTALLED TRENCH AS <br />CODE AND THE N.E.C. <br />28. INSTALL ALL VALVE WIRING IN MAINLINE TRENCH AS DETAILED. <br />28. INSTALL ALL REMOTE CONTROL VALVES AT HEIGHT INDICATED ON DETAILS, PS HIGH AS <br />POSSIBLE BUT ALLOWING CLEARANCE BETWEEN VALVE BOX LID AND FLOW CONTROL <br />HANDLE ON <br />ALL <br />REMOTE CONTROL VALVE. <br />W. INSTALL ALL MAINLINE GATE VALVES IN A ROUND PLASTIC VALVE BOX PER DETAILS. <br />W. ALL PVC SOLVENT <br />ERWELD <br />PIPE, AN SHALL BE ARE SHOWN <br />OR N SCHEMATICALLY <br />CHE ATI EQUAL. <br />31. THE MAINLINE LATERAL L LANDSCAPE <br />VALVES OUTSIDE OW.ANM PALE., ADJACENT <br />SHALL BE <br />INSTALLED WITHIN CU THE LANDSCAPE AREA, OUTSIDE R.O.W. AND PALE., ADJACENTTO <br />SIDEWALK FOLLOWING CURB AND OFFSET L T W HEREVER POSSIBLE. <br />32. SUPPLY WRENCHESFOR MATERIAL TO THE OWNER: <br />A) TWO WRENCHES FOR DISASSEMBLY AND ADJUSTING OF EACH TYPE OF SPRINKLER <br />HEAD AND VALVE SUPPLIED. <br />TWO KEYS FOR EACH OF THE CONTROLLERS. <br />C) <br />C( TWO COUPLERS WITH MATCHING HOSE BIBS AND SHUT-OFF VALVE. <br />D) TWO VALVE BOX KEYS. <br />33. ALL MAINLINE EEDPV FO PIPE 3" AND LARGER SMALLER. <br />BE CAST OR DUCTILE IRON FOR <br />PVC: SCHEDULE PE PVC FOR 2 INLAND SMALLER. <br />35, ALL MAINLINE PIPE MINIMUMHALL BE A OF TWOMOF MESTHEDULE 40. <br />36. SLEEVES <br />LMAINLINEANAMIGATIO EQUIPMENT <br />SHALLHE BE ETER PLACED IN THE NE LANDS. <br />36. ALL MAINLINE AND IRRIGATION EQUIPMENT SHALL BE PLACED IN THE LANDSCAPED <br />AREAS. <br />37, CONTROLLER WIRES THAT ARE <br />RYTWELVEBURIED <br />(12) FEET. <br />#14 NG INSTALLATION <br />BUNDLED SHALL <br />WRAPPED A MINIMUM OF EVERYTWELVE(12'( FEEr. DURING INSTALLATION WIRES SHALL <br />HAVER RI LOOP TIED IN ALL DIRECTION CHANGES GREATER THAT 30 DEGREES AND BE <br />UNTIED PRIOR TO TRENCH FILL IN. <br />38. DRIP LATERAL EM RUNS, ASH CAPS DESCRIBED <br />ON THE PLACED <br />INAVALVE BOX AT THE END OF ALL DRIP <br />LATERAL RUNS, AS DESCRIBED ON THE DRAWINGS. <br />39, ALL <br />ROPRIAVALVES. PRESSURE ALVEB ORS AND OMER MINIMUM <br />OF <br />SHALL REPLACED IN PEA <br />APPROPRIATELY SIZED VALVE BOX WITH A MINIMUM OF TWO (T'( INCHES OF PEA <br />GRAVEL. <br />40. PRIOR TO DEVIL ANY <br />ESTIRRIGATION <br />LLTEST HE MINSERVICE,AWNTI N TONDEVICE <br />CERTIFIED <br />COPY F THE <br />TESTER SHALL TEST THE NOHO IS PREVENTIONDEVICEAND GIVER <br />COPY OFTHE PASSED TEST RESULTS TOTHE SNOHOMIC COUNTY INSPECTOR OR MAIL IT <br />i0 THE SNOHOMISH COUNTY DEPARTMENT OF PUBLIC WORKS INSPECTION STATION. <br />41. AFTER ILOWDEVICESHAALL BBE A MINIMUM <br />DEVICES O(2'jHALL FEE <br />ESTED FROMTHE WATER <br />42. BACK FL OW SAME <br />THE <br />MINIMUM OFiWO(2'(FEET FROM THE WATER METER <br />AND BE THE SAME SIZE AS THE METER SERVICE LINE. <br />43. ALL CONCRETE <br />OAB WITH PREVENTION DEVICES SHALL HAVE AGEIIMUM 2LLED, CONCRETE <br />S B <br />CONCRETE SLAB WITH PIPE SLEEVES. IF A SECURITY CAGE IS INSTALLED, CONCRETE SHALL <br />BALL E SIX (E CROSSIINCHESNGS <br />SINTH ONALLSIDESSHALLAN BE MARITY KED ON E. <br />44. CURB WITH A N N DES THE DESTRUCTIBLE <br />MARKING. <br />SHALL BE MARKED ON EACH SIDE OF THE <br />CURB WITH ANON -DESTRUCTIBLE MARKING. <br />GRADING GENERAL NOTES: <br />I. CONTRACTOR SHALL GRADE TO MAINTAIN POSITIVE DRAINAGE AWAY FROM ALL <br />STRUCTURES. REVIEW ENGINEERS PLAN FOR DRAINAGE. <br />2. FINISH GRADING SHALL BE BY THE DIRECTION OF ME LANDSCAPE ARCHITECT. <br />3. LANDSCAPE ARCHITECT SHALL APPROVE GRADING PRIOR TO PLANTING. <br />4. GRADING FOR THIS PROJECT INCLUDES THE FOLLOWING: <br />A( FINE GRADING OF EXISTING ROUGH GRADES IS REQUIRED TO PROVIDE SMOOTH, <br />EVEN GRADE TRANSITION IN LANDSCAPE AREA. <br />B( IMPORTING AND PLACING OFF SITE 3/8" MINUS TOPSOIL" IN THE FOLLOWING <br />AREAS: <br />i( TURF, AND ANNUAL AREAS (6" DEPTH(. <br />ii) PLANT BACKFILL (CAN BE SCREENED ON -SITE SOIL(. <br />5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ANY CALICHE ENCOUNTERED ON <br />SITE AT NO ADDITIONAL COST TO THE OWNER. THE OWNER AND CONTRACTOR SHALL <br />COORDINATE A SUITABLE LOCATION ON SIZE TO DISPOSE OF THE CALICHE MATERIAL. <br />SHOULD A SUITABLE LOCATION ON SITE NOT EXIST, ME OWNER SHALL BE RESPONSIBLE <br />FOR ALL FEES ASSOCIATED WITH REMOVAL AND DISPOSAL OF THE CALICHE. <br />6. FINISH GRADE OF ALL PLANTING AREAS IS TO BE LS" BELOW ADJACENT PAVING UNLESS <br />NOTED OTHERWISE. <br />7. THE CONTRACTOR 15 RESPONSIBLE FOR GRADING ALL AREAS AT THE DIRECTION OF THE <br />LANDSCAPE ARCHITECT TO CREATE A NATURALLY UNDULATING GROUND PLANE. <br />VICINITY MAP: <br />100TH ST SW <br />I <br />■ <br />a <br />r <br />a <br />LU <br />le <br />C <br />E <br />U� <br />- <br />d <br />o <br />U <br />r <br />0 <br />e <br />a <br />a <br />W <br />W <br />W�U <br />S <br />a <br />o <br />b <br />� <br />O <br />` <br />n <br />v <br />Po <br />e <br />Q <br />C <br />ti <br />■ <br />HARDSCAPE GENERAL NOTES: <br />1. FOOTINGS, WALLS AND FENCES SHALL BE PLACED OUTSIDE OF THE <br />PUBLIC RIGHT-0FWAY. <br />2. ALL DETAILS SHALL BE REVIEWED BY A STRUCTURAL ENGINEER AND <br />MODIFIED (IF NECESSARY) PRIOR TO CONSTRUCTION. <br />3. THE CONTRACTOR SHALL HAVE SIDEWALK SURVEYED AND STAKED FOR <br />z <br />REVIEW BY ME LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />4. IN ADDITION TO SUBMITING MATERIAL SAMPLES OF ALL SITE RELATED <br />�° <br />O <br />q <br />r� <br />t/o <br />MATERIALS, THE CONTRACTOR SHALL PREPARE A 4'%4'SAMPLE PANEL <br />FOR EACH TYPE OF CONSTRUCTION, I.E., A( CONCRETE PAVERS, B( <br />VL/ <br />'^ <br />EXPOSED AGGREGATE PAVING, C( INTEGRAL COLORED CONCRETE, <br />�>' <br />^� PD V <br />a' <br />ETC., FOR APPROVAL BY THE LANDSCAPE ARCHITECT AND OWNER'S <br />CIS <br />I•I Z <br />AUTHORIZED REPRESENTATIVE PRIOR TO FINAL CONSTRUCTION. <br />141� <br />5. UNLESS NOTED OTHERWISE ON CONSTRUCTION DOCUMENTS OR NOTED <br />of <br />IN DETAILS, SIDEWALKS SHALL BE 5'-0sWIDE, HTHICK, 3,000 PSI CONCRETE <br />ON COMPACTED BASE WITH CONSTRUCTION JOINTS AT 5'-0" ON CENTER <br />W <br />h <br />AND EXPANSION JOINTS AT 20'4'ON CENTER. SIDEWALKS SHALL HAVE <br />Con <br />Q <br />MEDIUM BROOM, NON-SKID FINISH WITH I/Z RADIUS TOOLED EDGES. <br />Q <br />F O <br />6. RADIUS AT SIDEWALK INTERSECTIONS SHALL BE 5'-0"(TYPICAL(, U N LESS <br />NOTED OTHERWISE. <br />C��t..# <br />`V <br />7. THE CONTRACTOR SHALL LAYOUT AND VERIFY ALL HARDSCAPE ELEMENTS <br />PRIOR TO CONSTRUCTION FOR REVIEW BY THE LANDSCAPE ARCHITECT <br />OR OWNER'S AUTHORIZED REPRESENTATIVE. SHOULD DISCREPANCIES <br />~ <br />EXIST, CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OR <br />FURTHER. <br />�~ <br />W <br />OWNER'S AUTHORIZED REPRESENTATIVE BEFORE PROCEEDING <br />J <br />CIS <br />Q� <br />rrCIT <br />W <br />U LU <br />Ill <br />SHEET INDEX: <br />COVER SHEET L0.0 <br />LAYOUT PLAN L2.1 <br />PLANTING PLANS L3.1 <br />LIGHTING PLANS L5.1 <br />HARDSCAPE DETAILS L6.1 <br />PLANTING DETAILS L7.1 <br />LANDSCAPE SPECIFICATIONS L8.1 <br />IRRIGATION SPECIFICATIONS L8.2 <br />revisions: <br />ZL <br />ZL <br />0 <br />project #: <br />CAR 107 <br />scale: <br />NTS <br />issued for. <br />REVIEW <br />drawn by: <br />TEAM <br />date: <br />10.15.2021 <br />drawing: <br />Cover Sheet <br />■ <br />sheet % <br />L0.0 <br />■ ■ <br />orae:ip anr®a- <br />>ICYeli vare�;'i u,�,. <br />