My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8411 E XAVIER WAY 2023-10-16
>
Address Records
>
E XAVIER WAY
>
8411
>
8411 E XAVIER WAY 2023-10-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2023 8:02:24 AM
Creation date
9/11/2023 11:06:33 AM
Metadata
Fields
Template:
Address Document
Street Name
E XAVIER WAY
Street Number
8411
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4111) • . <br /> If you intend to remove the unpermitted work to convert the garage into bedrooms and remove the 2nd level deck, <br /> { then you will need to submit revisions to include revised scope of work and revised plans.We strongly suggest that the <br /> services of an Architect licensed by the State of Washington be secured to develop plans and details that show the <br /> project will meet code.The plans need to clearly depict the extent of the work proposed (or completed without <br /> permits) as well as address the code deficiencies found within the structure. Regardless of whether the decision is to <br /> remove or keep the unpermitted work,the construction plans need to show(at a minimum): <br /> 1. What the existing structure looked like prior to the alterations completed without permits. <br /> 2. What the structure's current condition looks like. <br /> 3. What has been altered and how it meets current code requirements. Include all unpermitted alterations to the <br /> property/structure and/or any proposed construction necessary to bring the property/structure into code <br /> compliance. <br /> 4. Plumbing, mechanical, and electrical plans are required to be included in the construction plans and will require <br /> plan review. <br /> Plans also need to reflect compliance with the Land Use and Zoning requirements in the Everett Municipal Code.The <br /> plans will be reviewed for compliance with the City's adopted codes in place at the time of permit submittal, not the <br /> codes in place when the work occurred. <br /> All unapproved work(including electrical, mechanical, plumbing, and framing systems etc.) installed/altered without <br /> permits and inspection approval will need to be exposed. <br /> If the existing shed is detached you will need to apply for a Demolition permit to remove it and also provide a site plan <br /> marking the location of the shed to be demolished.You can do that online through the online permitting portal. <br /> If Alex has any additional comments, she will respond in a separate email. <br /> Terri Jorgenson <br /> 11.0 Development Technician I Permit Services <br /> EVERETT 425.257.88611 3200 Cedar Street, 2"d Floor, Everett,WA 98201 <br /> Phone Hours: M-F 8:30am—3:00pm <br /> everettwa.gov/permits I Facebook 1 Twitter <br /> 2 n <br />
The URL can be used to link to this page
Your browser does not support the video tag.