Laserfiche WebLink
Element 13. Protect low Impact development: <br />❑ BMP C102: Buffer Zones <br />❑ BMP C103: High Visibility Plastic or Metal Fence <br />❑ BMP C200: Interceptor Dike and Swale <br />❑ BMP C207: Check Dams <br />❑ BMP C208: Triangular Silt Dike (Geotextile Encased Check Dam) <br />❑ BMP C231: Brush Barrier <br />❑ BMP C233 Silt Fence <br />❑ BMP C 234: Vegetated Strip <br />❑ Other Per the SWMMWW: <br />* Not applicable to my proposed project <br />Explain: ade"adpbea.a"�ae m•m"eam <br />•Task 3: Construction sWPPP drawings <br />Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br />• Show on your TESC Plan all BMPs selected above to satisfy the 13 Elements on your <br />TESC Plan. <br />• See City of Everett Public Works TESC Plan Example a103 <br />everettwo.aov/DacumentCenterNiew/7040 <br />Note: Construction StormwaterPollution Prevention Plans (Construction SWPPPS) that <br />involve engineering calculations must also be prepared by or under the direction of a <br />Washington State professional licensed engineer. <br />TASK 3: THE PROJECT PLANS INCLUDE TEMPORARY EROSION <br />AND SEDIMENT CONTROL PLANS. A SWPPP WILL BE PREPARED <br />AND REFINED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report Dec 2019 <br />