My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11500 SILVER LAKE RD 2025-04-21
>
Address Records
>
SILVER LAKE RD
>
11500
>
11500 SILVER LAKE RD 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:01:14 AM
Creation date
9/11/2023 3:22:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR #4: Preservation of Natural Drainage Systems <br />Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural <br />location. This Minimum Requirement has two main components to achieve: 1) maintain the natural on -she <br />drainage pattern and concentrated discharge location at the downstream property boundary, and 2) prevent <br />erosion at and downstream of the discharge locations. This requirement includes maintaining or replacing <br />systems which convey mnoff accross the site from upstream areas. All ouffalls require energy dissipation. <br />Task 1: Document existing and proposed drainage patterns and discharges <br />Check the boxes that apply below: <br />❑ This site has existing drainage systems or curtails. These items are shown on the <br />Stormwater Site Plan provided in MR 81 and are to include: type, slope, dimensions, <br />channel lining, direction of flow and buffer. <br />N This project will not after the existing drainage system in any way. if the existing <br />outfall(s) show sign of erosion and scour, energy disipation measures will be installed <br />or improved upon. Construction activity of any kind will not occur within at least 10 ft <br />of the edge of the channelized flow, BMP C102: Buffer Zones will be implemented <br />during the life of the project to include visible flagging or other demarcation technique. <br />If this requirement is not met a Hydraulic Project Approval (HPA) may be required from <br />the Washington Department of Fish and Wildlife. <br />In The site does not have any existing drainage systems or outfalls. <br />Descrhe how stormwater will be discharged from the site without causing erosion and <br />flooding downstream: <br />This project does not propose to alter the existing hydrology or <br />hydraulic characteristics. Waters will infiltrate and or runoff with the <br />same characteristics as the existing condition. <br />❑ The existing concentrated drainage system traversing the property will be impacted as <br />part of this project and is shown on the stormwater site plan. <br />Describe how your project impacts or changes the existing drainage systems as a result <br />of your project and how you will address it: <br />City ofEveren Park works <br />Small Pmlect Stormwater are Plan Report Dec 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.