Laserfiche WebLink
OTask 2: Select where the project will discharge its stormwater <br />❑ An existing piped conveyance system <br />❑ Outlet protection such as rip -rap pad (less than 0.3 CFS) <br />❑ DIsnp[Sion trench or other dispersion facility(0.3 to 0.75 CFS) <br />❑ Piped conveyance to appropriate discharge location with easement if required <br />(greater than or equal to 0.75 CFS) <br />9 Other: imi maintain aunew iopoeaony <br />City of Everett Public Works <br />Small Project Stmowater Site Plan Report Dec 2019 <br />